Workflow
和平大道延长线(工人村路—四环线)
icon
Search documents
青山增加一条出城快速通道
Chang Jiang Ri Bao· 2025-07-16 00:15
Core Points - The Peace Avenue Extension Project (Worker Village Road to Ring Road) has made significant progress with the commencement of drilling for the double-tower cable-stayed bridge, marking an important development in connecting the inner and outer rings of Wuhan [1] - The project spans approximately 5.4 kilometers, featuring a combination of elevated and ground-level roads, with the elevated section measuring about 4.23 kilometers and accommodating six lanes in both directions [1] - The main elevated structure will utilize a double-tower cable-stayed bridge design, which is 703 meters long and has a tower height of 115.8 meters [1] Infrastructure Impact - Upon completion, the Peace Avenue Extension will enhance traffic flow in the Wugang and Wudong areas, facilitating urban renewal and modernization efforts [1] - The project is expected to support the development of the Wuhuo integrated transportation hub and serve as a vital corridor for the integration strategy of Wuhan and surrounding regions [2] - It will provide a more convenient transportation link between Wuhan and neighboring cities such as Ezhou, Huanggang, and Huangshi, promoting economic exchanges and personnel movement within the Wuhan metropolitan area [2]