Workflow
基于水电站设备运行时间和发电量统计的智慧运行方法
icon
Search documents
长江电力申请基于水电站设备运行时间和发电量统计的智慧运行方法专利,提高水电站的发电效率和稳定性
Jin Rong Jie· 2025-07-09 04:02
Group 1 - China Yangtze Power Co., Ltd. has applied for a patent titled "Intelligent Operation Method Based on Hydropower Station Equipment Operating Time and Power Generation Statistics" [1] - The patent application was published under CN120277128A with an application date of March 2025 [1] - The intelligent operation method includes several steps: determining optimal data collection periods, calculating planned power generation, real-time monitoring and error calculation, closed-loop control adjustment, and customized operational management strategies [1] Group 2 - China Yangtze Power Co., Ltd. was established in 2002 and is located in Beijing, primarily engaged in the production and supply of electricity and heat [2] - The company has a registered capital of approximately 24.47 billion RMB [2] - The company has made investments in 46 enterprises, participated in 5,000 bidding projects, and holds 5000 patent information along with 432 administrative licenses [2]