天辰齐翔相关化工产品
Search documents
中国化学:天辰齐翔二期项目仍在筹备中
Zheng Quan Ri Bao Wang· 2025-11-27 11:13
Core Viewpoint - China Chemical (601117) has confirmed that Tianchen Qixiang is operating at a high capacity level after technical modifications and maintenance, while the second phase of the project is still in preparation [1] Group 1 - The current operational status of Tianchen Qixiang is at a high load level following recent technical upgrades and repairs [1] - The second phase of the Tianchen Qixiang project is still in the preparatory stage [1]