带电作业服务
Search documents
国网酒泉供电公司:带电作业护光明 民生用电“零感知”
Zhong Guo Neng Yuan Wang· 2025-08-22 08:00
Core Viewpoint - The company emphasizes the importance of safety and efficiency in live-line work, ensuring uninterrupted power supply while addressing customer needs and enhancing service quality [1][4][5]. Group 1: Safety and Operational Efficiency - The company conducted a live-line operation on August 21, focusing on safety and adherence to standard procedures during the task [1]. - The operation involved skilled personnel performing various tasks such as insulation shielding and installation of line clamps, with ground monitoring to ensure safety measures were in place [3]. - The successful completion of the task not only resolved customer electricity issues but also received praise from local residents for maintaining power supply [3]. Group 2: Commitment to Continuous Improvement - The company has adopted a "can do without interruption" principle, enhancing live-line operation types and expanding their coverage through personnel training [4]. - The goal is to achieve "zero power outage for users" and "zero loss of distribution network load," allowing live-line work to be completed with minimal disruption to residents [4]. - The company is focused on proactive measures, including regular inspections and infrared temperature monitoring of critical equipment, to ensure early detection and resolution of potential issues [4]. Group 3: Strategic Focus on Service Quality - The company prioritizes live-line work to enhance power supply reliability and service quality, especially in rural areas, contributing to local economic development [5]. - There is a commitment to increasing the coverage of live-line operations in various projects, including network construction and fault repairs, to support continuous power supply [5].
国网濉溪县供电公司:电网升级“零感知” 技术赋能惠民生
Zhong Guo Neng Yuan Wang· 2025-05-28 16:34
Core Viewpoint - The company has successfully completed its first independent live-line work on a 10kV line, enhancing the reliability of power supply while minimizing disruptions to residents' lives [1][2]. Group 1: Live-Line Work Implementation - The live-line work at the Shuangdui Center Power Supply Station involved skilled personnel using insulated equipment to perform tasks without interrupting power supply [1]. - This marks a significant improvement in operational efficiency, as previously such tasks required external coordination, which was time-consuming and costly [2]. Group 2: Capacity Building and Training - The company has been actively exploring new models to enhance the capacity for live-line work through training, on-site guidance, and remote supervision [2]. - Multiple rounds of support have enabled the Nanjing Power Supply Station and Shuangdui Power Supply Station to independently conduct live-line operations, significantly increasing the workforce's capability [2]. Group 3: Operational Achievements - The company has adhered to the principle of "less downtime, more supply," successfully completing 1,281 live-line operations this year, a 79.53% increase year-on-year [4]. - Future plans include continuing to promote live-line work and comprehensive maintenance to ensure high standards of uninterrupted operations, thereby supporting the region's high-quality development [4].