永定河左岸堤防滨水慢行系统
Search documents
堤上新建9.1公里慢行步道,永定河左岸堤防“平急两用”升级
Bei Jing Ri Bao Ke Hu Duan· 2025-10-31 13:04
Core Viewpoint - The Yongding River Lushan Section Comprehensive Improvement Project is nearing completion, featuring a 4.6-kilometer long waterfront slow-moving system that will connect with an existing system to create a total of approximately 9.1 kilometers of waterfront pathways for public leisure and recreation [1][9]. Group 1: Project Overview - The main construction of the Yongding River left bank embankment has been largely completed, with finishing touches being applied, including the planting of trees such as Chinese scholar trees and drought-resistant willows [3][5]. - The new slow-moving space on the embankment, which is 3.4 meters wide, will provide citizens with opportunities for walking, running, cycling, and enjoying river views, enhancing public access to the waterfront [5][9]. Group 2: Engineering and Environmental Aspects - The project includes the installation of a vertical anti-erosion wall that enhances flood resistance, with a depth of 23 meters and a thickness of 0.8 meters, significantly improving the structural integrity and longevity of the embankment [5][7]. - The construction process minimizes disruption to the river environment and surrounding communities, avoiding large-scale excavation while also focusing on ecological restoration by planting various plants along the riverbanks [7][9]. Group 3: Broader Context and Future Developments - This improvement project is part of the post-disaster recovery efforts following the "23·7" flood in the Haihe River basin, aiming to enhance the flood control system and improve the water ecology and environment of the Yongding River [9]. - The Yongding River management authority is currently in a critical phase of a three-year enhancement plan, which includes multiple sections and aims to provide better recreational spaces for the public [9].