Workflow
油气化工码头
icon
Search documents
长江在建规模最大码头升级工程开工
Zhong Guo Hua Gong Bao· 2025-10-21 02:32
Core Insights - The project marks the largest ongoing terminal upgrade in the Yangtze River basin, with full construction now underway following the successful piling of berth steel pipes [1] - The upgrade consolidates the existing four berths into three 5,000-ton and one 10,000-ton oil and gas chemical berths, with a designed annual throughput capacity of 3.496 million tons [1] - The new terminal will feature a floating dock design and will be equipped with intelligent and environmentally friendly facilities, establishing an integrated safety defense system for monitoring, early warning, and response [1] - Upon completion, the terminal will meet the raw material transfer needs of the Sino-Korean Petrochemical's one million-ton ethylene project, enhancing the smart management and environmental standards of the terminal area, thus supporting the green and high-quality development of the Yangtze Economic Belt [1]