Workflow
济南火车站北站房
icon
Search documents
百年济南火车站迈入“双向进出”时代
Qi Lu Wan Bao· 2025-09-25 22:16
Core Viewpoint - The newly constructed North Station building of Jinan Railway Station will significantly enhance passenger travel convenience by implementing a "south-north dual-direction entry and exit" model, addressing the increasing traffic demands of the city [2][3] Group 1: Infrastructure and Design - The North Station building, located on the north side of Jinan Station, has a total construction area of 41,995 square meters, with a height of 28.2 meters and a structure comprising one underground and two above-ground levels [2] - The North Station features a main entry on the first floor and an underground entry, with 8 platforms and 11 tracks operational from the start [2] Group 2: Transportation Connectivity - Six bus routes connect to the North Square, including the newly launched 778 route, which links major tourist attractions like Daming Lake and Baotu Spring [3] - The second metro line's "Jinan Station North" stop has been opened, allowing for seamless access from the subway to the train station [3] Group 3: Project Development and Impact - The project was approved in 2020 by the National Railway Group and the Shandong Provincial Government, with significant attention and coordination from the Jinan Urban and Rural Transportation Bureau to address construction needs and challenges [3] - The North Station is expected to serve as a "new engine" for Jinan, enhancing the city's internal transportation network and solidifying its position in the national railway framework [3]
百年老站实现“双向进出”
Qi Lu Wan Bao· 2025-09-25 22:16
Core Viewpoint - The newly constructed North Station building of Jinan Railway Station officially opened on September 26, enabling a "two-way entry and exit" mode for the century-old station [2] Group 1: Infrastructure Development - The North Station building features a main entrance on the first floor and an underground entrance, enhancing accessibility [2] - The underground level connects seamlessly with bus, taxi, private car areas, and the subway through an underground corridor [2] Group 2: Passenger Experience - The new layout allows passengers to complete transfers within 5 minutes from the North Square, significantly improving travel convenience [2]