Workflow
深汕特别合作区蓝骏储能电站项目设计施工总承包(EPC)
icon
Search documents
广东建工(002060.SZ):签订深汕特别合作区蓝骏储能电站项目设计施工总承包(EPC)合同
Ge Long Hui A P P· 2025-11-24 09:53
Core Viewpoint - Guangdong Construction (002060.SZ) has announced the signing of a design and construction general contracting (EPC) contract for the Shenshan Special Cooperation Zone Blue Jun Energy Storage Power Station project, which is expected to enhance the company's operational performance and profitability [1] Group 1: Project Details - The project is located in the Shenshan Special Cooperation Zone and involves the construction of a 300MW/1200MWh electrochemical energy storage power station, consisting of four main components: energy storage system, energy storage booster station, outgoing lines, and expansion interval on the opposite side [1] - The total contract amount is 1.888 billion yuan, with Guangdong Yuantian responsible for 1.876 billion yuan of the engineering tasks [1] - The contract duration is set for 120 days [1] Group 2: Business Implications - The undertaking of this engineering project by Guangdong Yuantian is aimed at expanding the scale of construction business and improving profitability, which is expected to positively impact the operational performance of both Guangdong Yuantian and the company [1]
广东建工:签订深汕特别合作区蓝骏储能电站项目设计施工总承包(EPC)合同
Ge Long Hui· 2025-11-24 09:51
Core Viewpoint - Guangdong Construction announced the signing of a design and construction general contracting (EPC) contract for the Shenshan Special Cooperation Zone Blue Jun Energy Storage Power Station project, which is expected to enhance the company's operational performance and profitability [1] Group 1: Project Details - The project is located in the Shenshan Special Cooperation Zone and involves the construction of a 300MW/1200MWh electrochemical energy storage power station, consisting of four main components: energy storage system, energy storage booster station, outgoing lines, and expansion interval on the opposite side [1] - The total contract amount is 1.888 billion yuan, with Guangdong Yuantian responsible for 1.876 billion yuan of the engineering tasks [1] - The contract duration is set for 120 days [1] Group 2: Business Implications - The undertaking of this engineering project by Guangdong Yuantian aims to expand the scale of construction business and improve profitability [1] - The project is expected to have a positive impact on the operational performance of both Guangdong Yuantian and the parent company [1]