Workflow
电池储能系统 (BESS)
icon
Search documents
43GWh!宁德时代接连“爆单”
鑫椤储能· 2025-03-07 09:20
Group 1 - Quinbrook Infrastructure Partners announced a collaboration with CATL to develop an 8-hour battery storage project in Australia, with a deployment capacity of 3GW/24GWh [1] - The EnerQB system is claimed to be the world's first true 8-hour lithium-ion battery storage system, co-designed by Quinbrook and CATL over two years [1] - CATL has secured over 43GWh of overseas energy storage orders, including a significant contract for over 10GWh in 2023 [1] Group 2 - In January 2025, CATL was selected as the preferred supplier for a large-scale "all-weather" photovoltaic storage project in Abu Dhabi, providing a 19GWh storage system using advanced TENER technology [1] - In April 2024, CATL signed a long-term procurement agreement for 350MWh of liquid-cooled storage batteries for the Japanese market with Taoke New Energy [2] - In October 2024, CATL entered into a large supply contract with Spanish renewable energy developer Grenergy to provide 1.25GWh of EnerX battery storage systems for a project in Chile [2]
比亚迪又获电池大单!
鑫椤锂电· 2025-03-06 07:18
据报道,目前Greenvolt集团已经开始了对变电站的基础设施建设等工作,这两个项目计划于2025年第四 季度开始逐步交付, 并将于2026年第一季度完工 。 据了解,Greenvolt集团在波兰已活跃近18年,通过Greenvolt Power开发风能、太阳能和储能项目等。 Greenvolt目前的电池储能项目总储备容量为2.6GW。 "这份合同是我们迄今为止在欧洲签署的最大合同"Greenvolt集团首席执行官João Manso Neto说,"与 比亚迪储能的 协议加强了我们对开发和执行储能项目的承诺,这对最大限度地整合可再生能源至关重 要。" -广告- 关注公众号,点击公众号主页右上角" ··· ",设置星标 "⭐" ,关注 鑫椤锂电 资讯~ 当地时间3月3日, 葡萄牙Greenvolt集团子公司Greenvolt Power与中国比亚迪储能公司签署协议,在波 兰开发高达1.6GWh的电池储能系统 (BESS) 项目。 该合同涵盖两个储能项目的设计与运营,项目总容量为400MW/1600MWh,两座储能设施分别位于 Turosn Koscielna 和 Nowa WiesElcka,每个项目规模各为2 ...