Workflow
第四代磷酸锰铁锂正极材料
icon
Search documents
2万吨磷酸锰铁锂项目签约山西
起点锂电· 2025-08-08 10:13
Group 1 - The core viewpoint of the article highlights the collaboration between Changzhi High-tech Zone Management Committee and Zhengkunyuan (Beijing) Technology Co., Ltd. to establish a project for the annual production of 20,000 tons of fourth-generation lithium iron manganese phosphate [2] - The total investment for the project is 300 million yuan, located in the Zhangze Industrial Park of Changzhi High-tech Zone, with plans to build a smart production line for the annual output of 20,000 tons of fourth-generation lithium iron manganese phosphate cathode materials [2] - The project will be constructed in two phases, with the first phase having a total investment of 80 million yuan and utilizing a standardized factory area of 5,000 square meters. Once fully operational, the project is expected to generate an annual output value of approximately 1 billion yuan [2] Group 2 - JinkoSolar collaborates with EVE Energy to jointly develop battery cells [4] - The first industry forum on household storage and portable energy storage battery technology is scheduled for September 26 in Shenzhen [4] - The first International Summit and Exhibition on Sulfide All-Solid-State Batteries is set for November 8 in Guangzhou [4]
3亿元!2万吨/年磷酸锰铁锂项目签约山西!
鑫椤锂电· 2025-08-08 08:43
Core Viewpoint - The article highlights the collaboration between Changzhi High-tech Zone Management Committee and Zhengkunyuan (Beijing) Technology Co., Ltd. to establish a project for the production of 20,000 tons of fourth-generation lithium manganese iron phosphate annually, indicating a significant investment in the lithium battery industry [1]. Group 1 - The project involves a total investment of 300 million yuan, with the production line located in the Zhangze Industrial Park of Changzhi High-tech Zone [1]. - The construction of the project will be carried out in two phases, with the first phase requiring an investment of 80 million yuan and utilizing a standardized factory area of 5,000 square meters [1]. - Once fully operational, the project is expected to generate an annual output value of approximately 1 billion yuan [1].