Workflow
能量管理系统(EMS)
icon
Search documents
四川新都区110MW/220MWh电网侧新型储能项目储能系统设备采购
Core Viewpoint - The article discusses the procurement announcement for a new energy storage project in Xindu District, Sichuan Province, which involves a 110MW/220MWh energy storage system [2]. Group 1: Project Overview - The project is located in Xindu District, Chengdu, and utilizes a total area of approximately 25 acres, currently a precast factory site [2]. - The project aims to connect to the grid via a 110kV line to the nearby Tuanjie 220kV substation, approximately 2.2 km away [6]. Group 2: Procurement Requirements - Bidders must have supplied and put into operation at least two individual projects with a capacity of 100MWh or more of lithium iron phosphate electrochemical energy storage systems from January 1, 2022, to the bid deadline [3]. - Bidders must also have signed contracts for a cumulative total of no less than 440MWh of lithium iron phosphate electrochemical energy storage systems by January 1, 2024 [3][15]. Group 3: Scope of Work - The procurement includes the design, manufacturing, factory testing, packaging, and transportation of energy storage system equipment, including battery systems, inverters, and energy management systems [9]. - Responsibilities also include providing technical services such as installation guidance, commissioning, and performance testing [10]. Group 4: Delivery and Timeline - The delivery location is specified as the energy storage site in Xindu District, with a delivery method of truck delivery [7]. - The contract stipulates that delivery conditions must be met within 60 days from the contract signing date, with specific delivery times to be confirmed by the buyer [13]. Group 5: Bidder Qualifications - Bidders must be independent legal entities within the People's Republic of China and must meet specific performance and product manufacturing capability requirements [15]. - Bidders must demonstrate production capabilities for at least two of the following products: cells, PCS (inverters), BMS (battery management systems), and EMS (energy management systems) [15]. Group 6: Bid Submission - The deadline for bid submission is set for June 25, 2025, at 09:30 AM, and submissions must be made through the electronic procurement platform [19]. - Bidders are advised to upload their bid documents at least one day in advance to avoid technical issues on the submission day [19]. Group 7: Contact Information - The project is managed by Yalong River Basin Hydropower Development Co., Ltd., with specific contacts provided for both the project and the bidding agency [14][26].
众智科技:新能源/混合能源为公司的新业务板块
Zhong Zheng Wang· 2025-05-26 03:01
Group 1: New Energy Business - The company has launched a new business segment focused on new energy and hybrid energy, which includes products and solutions related to energy management and storage systems [1] - Current offerings include Energy Management Systems (EMS), Battery Management Systems (BMS), lithium battery protection boards, and energy storage cabinets [1] - The products can create small-scale power grids that interact flexibly with the public grid while also being relatively independent, enabling multi-energy complementarity with wind, solar, oil, and gas [1] - The company is advancing the research and testing of storage inverters (PCS), with existing customers already trialing the products [1] Group 2: Marine Products - The company's marine products, including generator controllers and engine controllers, are primarily used in various types of vessels for power propulsion and generation control systems [2] - The company has increased investment in marine products and technology, expanding its product line and obtaining certifications from multiple classification societies [2] - The focus is on consolidating existing marine control system business while also targeting higher-end application markets [2]
海博思创交出首份年报,分红力度碾压阳光电源
Xin Lang Cai Jing· 2025-04-30 08:41
Core Insights - Haibo Sichuang (688411.SH) reported its first annual financial results post-IPO, achieving a revenue of 8.27 billion yuan, a year-on-year increase of 18.44%, and a net profit of 648 million yuan, up 12.06% [1][3] - The company plans to distribute a cash dividend of 11 yuan per 10 shares, totaling approximately 196 million yuan, which accounts for about 30% of its total profit [1] - Haibo Sichuang is recognized as a leading player in the domestic energy storage integration market, ranking first in installed capacity among operational power stations in China by the end of 2024 [3][4] Financial Performance - In Q4, Haibo Sichuang's profit reached 334 million yuan, representing over half of the annual profit, with the highest net cash flow from operating activities at 2.41 billion yuan [3] - The company produced 11,411 MWh of energy storage products, a year-on-year increase of 35.4%, and sold 11,815 MWh, up 90.19% [3] - The gross margin for the energy storage sector was 18.22%, a decrease of 1.19 percentage points year-on-year, with domestic gross margin at 16.85% and overseas gross margin at 42.14% [3] Research and Development - R&D investment increased by 40.1% to 250 million yuan, accounting for nearly 40% of the net profit, aimed at maintaining technological leadership [6][8] - The number of R&D personnel grew from 205 to 322, with total compensation rising from 75 million yuan to 120 million yuan, a 60% increase [6][7] - The company focuses on AI integration and big data for lifecycle management of energy storage stations [8] Market Position and Strategy - Haibo Sichuang has established partnerships with leading companies in the U.S., France, and Australia, and has delivered projects in Germany and Finland [4][5] - The company aims to reduce low-price competition and focus on market-driven orders, anticipating a market polarization where leading firms will capture a larger market share [10] - As of April 30, Haibo Sichuang's stock price increased by 13.61%, with a total market capitalization of approximately 13.2 billion yuan [11]
国能巴州抽水蓄能配套335MWh储能系统设备招标
中关村储能产业技术联盟· 2025-03-29 11:10
Core Viewpoint - The article discusses the public tender for a 335MWh energy storage system project by Guodian Power in Xinjiang, highlighting the project's scope, requirements, and timelines for delivery [2][3][4]. Project Overview - The project involves the construction of a 335MWh energy storage system across three counties in Xinjiang: Bole County, Yanqi County, and Hejing County, with specific geographical and logistical details provided for each site [2]. - The energy storage system is designed to have a capacity of no less than 167.5MW/335MWh, including various components such as battery packs, management systems, and transformers [3]. Tender Scope and Requirements - The tender includes the complete design, procurement, assembly, transportation, and installation guidance for the energy storage system [3]. - The supplier is responsible for the quality assurance and maintenance of the system during the warranty period, ensuring performance standards are met [3]. Delivery Timeline and Locations - The project aims to complete the delivery of equipment for the Yanqi and Hejing solar projects by May 5, 2025, and for the Bole solar project by July 31, 2025 [4]. Qualification and Performance Requirements - Bidders must be legally registered entities and manufacturers of specific components related to the energy storage system [5]. - Bidders are required to have prior experience with contracts for energy storage systems of at least 40MW/80MWh scale [6]. Upcoming Industry Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, in Beijing, featuring over 800 exhibitors and numerous thematic forums [8][11].