Workflow
AI及大模型在储能电池领域应用
icon
Search documents
暂别亦是新程!ESIE 2025储能展会在京闭幕
中关村储能产业技术联盟· 2025-04-13 09:08
Core Viewpoint - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) held in Beijing highlighted the rapid growth of the energy storage industry as a key driver of global energy transition, attracting nearly 800 exhibitors and over 100,000 professional attendees [1][34]. Group 1: Event Overview - The summit focused on the theme "Digital Intelligence Empowering Industrial Transformation, Energy Storage Reshaping Energy Landscape" and featured a total of 200,000 professional visitors throughout the event [1]. - The event was organized by the Zhongguancun Energy Storage Industry Technology Alliance, the China Energy Research Society, and the Institute of Engineering Thermophysics, Chinese Academy of Sciences [1]. Group 2: Key Participants and Discussions - The opening ceremony included speeches from seven academicians and over a hundred leaders from power grid companies, generation groups, and local governments, emphasizing the importance of collaboration in the energy sector [3][6]. - The summit featured a high-level dialogue among industry leaders discussing opportunities and challenges brought by the marketization of new energy [8]. Group 3: Technological Innovations and Trends - The summit hosted the 8th Frontier Technology Conference on Energy Storage, where experts discussed advanced storage materials, AI applications, sodium-ion storage, and hydrogen fuel cells [7]. - Over 100 new energy storage products were launched at the summit, showcasing advancements in battery capacity and smart trading attributes [15]. Group 4: International Collaboration and Networking - The event included three international forums and four international business matchmaking sessions, facilitating connections between Chinese energy storage companies and international stakeholders from regions such as Europe, Southeast Asia, and the Middle East [12]. - The summit also featured a series of thematic forums addressing policy directions, technological research, and market mechanisms in the energy storage sector [9]. Group 5: Industry Recognition and Future Outlook - The 9th International Energy Storage Innovation Competition and the 2024 China Energy Storage Enterprise Rankings were announced, reflecting the industry's innovation and competitiveness [22]. - The next International Energy Storage Summit and Exhibition is scheduled for April 1-3, 2026, indicating ongoing commitment to industry development and collaboration [35].
ESIE 2025储能展会全版日程
中关村储能产业技术联盟· 2025-04-09 09:12
Core Viewpoint - The 13th International Energy Storage Conference and Exhibition (ESIE 2025) will be held from April 10 to 12, 2025, at the Beijing Capital International Exhibition Center, featuring over 800 exhibitors and sponsors, and expecting more than 200,000 attendees from various sectors including government, research institutions, and energy companies [1]. Event Overview - The event will cover the entire energy storage industry chain, showcasing innovations and developments in energy storage technology [1]. - A series of pre-conference activities will take place, including business networking events and closed-door discussions on safety and risk monitoring in large-scale energy storage systems [5][6]. Detailed Agenda - The opening ceremony will feature keynote speeches from prominent figures in the energy sector, including officials from the National Energy Administration and the State Grid Corporation [7]. - Various forums and workshops will be held throughout the event, focusing on topics such as energy storage safety, market trends, and technological innovations [8][10][11]. - The event will also include the 9th International Energy Storage Innovation Competition award ceremony, recognizing outstanding contributions in energy storage technology [7]. Key Sessions - The conference will host high-level dialogues among industry leaders discussing the opportunities and challenges presented by the marketization of new energy [8]. - Specialized forums will address specific themes such as battery technology, energy storage design solutions, and the integration of AI in energy storage systems [12][22][24]. - The event will also feature discussions on the development of new energy systems and the role of energy storage in achieving carbon neutrality [21][23].
比亚迪储能邀您共聚ESIE 2025第13届储能国际峰会暨展览会
中关村储能产业技术联盟· 2025-04-05 11:24
Core Viewpoint - The article highlights the upcoming 13th Energy Storage International Summit and Exhibition (ESIE 2025) scheduled for April 10-12, 2025, at the Capital International Exhibition Center, showcasing advancements in energy storage technology and solutions [2]. Group 1: Company Overview - BYD has been involved in energy storage since 2008, focusing on the research, development, and application of energy storage systems and equipment, forming a complete industrial chain that includes product development, manufacturing, sales, service, and recycling [3]. - BYD's energy storage products cater to various applications, including power-side storage, grid-side storage, commercial and industrial storage, and residential storage, with solutions provided to hundreds of energy storage projects globally [3]. - The company emphasizes providing safe, stable, convenient, and cost-effective energy storage products and green energy solutions, contributing to the global low-carbon energy transition [3]. Group 2: Product Offerings - BYD offers a comprehensive range of energy storage solutions, including the MC Cube-T Pro ESS, MC Cube-T ESS, Chess Plus, MC-I, and BatteryBox series, designed to meet diverse energy storage needs from power generation to end-user applications [4][6][8][10][12]. - The MC Cube-T Pro ESS utilizes advanced cell stacking technology and an intelligent liquid cooling system to enhance overall performance and economic efficiency throughout the lifecycle of energy storage stations [4]. - The MC Cube-T ESS features a new generation of high-capacity, safe energy storage batteries, achieving an 11% increase in single cell energy and a 36% reduction in component count, improving space utilization by 98% [6]. - The Chess Plus product is designed for commercial storage, offering multiple safety features and quick return on investment, establishing a benchmark for cost-effectiveness in commercial energy storage [8]. - The MC-I product is highly integrated and designed for smaller space requirements, allowing for modular design and easy installation, enhancing revenue generation and return on investment [10]. - The BatteryBox series has been installed in over 110 countries, with more than 1.1 million units, becoming a trusted choice for residential users [12]. Group 3: Key Projects - BYD is involved in several significant energy storage projects, including the world's largest single-unit energy storage project in Saudi Arabia with a capacity of 500MW/2600MWh [14]. - The company is also part of China's largest integrated wind-solar-fire-hydrogen energy storage project with a capacity of 300MW/1200MWh [16]. - Other notable projects include a high-altitude independent energy storage station in China with a capacity of 100MW/400MWh and a project in a harsh desert environment with a capacity of 200MW/400MWh [16][18]. - BYD has signed contracts for major energy storage projects, including a 12.5GWh project with Saudi Electricity Company and a 1.6GWh project with Greenvolt Power [26].
倒计时10天!ESIE 2025储能展参会观展指南攻略发布
中关村储能产业技术联盟· 2025-03-31 10:05
Core Viewpoint - The 13th Energy Storage International Conference and Expo (ESIE 2025) will take place from April 10 to April 12, 2025, at the Capital International Exhibition Center in Beijing, featuring over 800 leading global energy storage companies and a wide range of activities including forums, product launches, and networking events [5][27]. Event Overview - The event will include an exhibition area of over 160,000 square meters, an opening ceremony, an academic forum, high-level dialogues, and more than 40 thematic forums [5][27]. - Key activities will consist of 500+ global product launches and various special events [5][27]. Registration and Attendance - Early bird tickets for the conference are available until the last day of registration [5]. - Professional audience registration will be conducted at the venue, with specific times outlined for attendee check-in [7][8]. Transportation and Venue Information - The Capital International Exhibition Center can be accessed via multiple subway lines, including Line 15, which connects to various other lines for convenient travel across Beijing [9]. - Detailed transportation options from major airports and train stations to the venue are provided, ensuring ease of access for attendees [10]. Accommodation - A range of hotel options with special rates for attendees is available, including five-star hotels and other accommodations within a reasonable distance from the venue [13]. Agenda Highlights - The agenda includes a series of pre-conference activities, opening ceremonies, and thematic forums focusing on various aspects of energy storage technology and market trends [14][15]. - Notable forums will cover topics such as new energy and large-scale energy storage, safety standards, and innovative applications in the energy sector [18][26]. Special Features - The event will showcase six national-level industry-education integration platforms for the first time, along with various specialized salons and competitions [26][27]. - The "Energy Storage Innovation Competition" will also be launched, inviting participants to submit their innovative projects [26].
国能巴州抽水蓄能配套335MWh储能系统设备招标
中关村储能产业技术联盟· 2025-03-29 11:10
Core Viewpoint - The article discusses the public tender for a 335MWh energy storage system project by Guodian Power in Xinjiang, highlighting the project's scope, requirements, and timelines for delivery [2][3][4]. Project Overview - The project involves the construction of a 335MWh energy storage system across three counties in Xinjiang: Bole County, Yanqi County, and Hejing County, with specific geographical and logistical details provided for each site [2]. - The energy storage system is designed to have a capacity of no less than 167.5MW/335MWh, including various components such as battery packs, management systems, and transformers [3]. Tender Scope and Requirements - The tender includes the complete design, procurement, assembly, transportation, and installation guidance for the energy storage system [3]. - The supplier is responsible for the quality assurance and maintenance of the system during the warranty period, ensuring performance standards are met [3]. Delivery Timeline and Locations - The project aims to complete the delivery of equipment for the Yanqi and Hejing solar projects by May 5, 2025, and for the Bole solar project by July 31, 2025 [4]. Qualification and Performance Requirements - Bidders must be legally registered entities and manufacturers of specific components related to the energy storage system [5]. - Bidders are required to have prior experience with contracts for energy storage systems of at least 40MW/80MWh scale [6]. Upcoming Industry Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, in Beijing, featuring over 800 exhibitors and numerous thematic forums [8][11].
直流侧0.39元/Wh+电芯0.32元/Wh!新风光2GWh储能入围招标中标候选人公示
中关村储能产业技术联盟· 2025-03-29 11:10
Core Viewpoint - The article discusses the recent public tender results for energy storage systems and lithium iron phosphate battery cells, highlighting the competitive pricing and participation of various companies in the bidding process [1][3][4]. Group 1: Tender Results - New Fengguang Electronic Technology Co., Ltd. has been shortlisted as a candidate for the energy storage tender, which includes two segments: a 1GWh direct current energy storage system and a 1GWh lithium iron phosphate battery cell [1]. - The direct current side tender has two categories: 5MWh direct current and commercial storage of 261kWh, with an average bid price of 0.39 yuan/Wh and a maximum bid from Kunyu Power and CRRC Zhuzhou Institute [1][3]. - The battery cell tender attracted nine companies, with an average bid price of 0.32 yuan/Wh, and the highest bids were from Ruiyuan Electric and CATL [3][4]. Group 2: Bidder Details - The leading bidders for the direct current side include: - CRRC Zhuzhou Electric Locomotive Research Institute: 428.8 million yuan at 0.43 yuan/Wh - Shandong Electric Times Energy Technology: 368.5 million yuan at 0.37 yuan/Wh - BYD Auto Industry: 408 million yuan at 0.41 yuan/Wh [3]. - For the battery cell segment, notable bidders include: - Guangzhou Penghui Energy: 2.6 billion yuan at 0.26 yuan/Wh - Ningde Times New Energy Technology: 3.4 billion yuan at 0.34 yuan/Wh - Hubei Yiwei Power: 2.8 billion yuan at 0.28 yuan/Wh [4]. Group 3: Upcoming Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, at the Capital International Exhibition Center, covering over 160,000 square meters with participation from over 800 leading companies [6]. - The event will feature more than 500 new product launches and is expected to attract over 200,000 professional visitors, along with 40 thematic forums discussing new opportunities in energy storage [6][8].
国电许继500MW/1GWh储能设备招标
中关村储能产业技术联盟· 2025-03-27 09:51
Core Viewpoint - The article discusses the procurement announcement by State Grid XJ Electric (Beijing) New Energy Technology Co., Ltd. for two energy storage projects, highlighting the scale and requirements for bidders [2][3]. Group 1: Project Overview - The procurement involves a 400MW/800MWh energy storage station in Pingding County and a 100MW/200MWh energy storage station in Guangdong [2][3]. - The total funding for the projects is sourced from self-raised funds amounting to 70 million yuan [3]. Group 2: Bidding Scope - The bidding is divided into three packages: 1. Package 1: Procurement of the Guangdong Zhaoqing 100MW/200MWh energy storage station system equipment 2. Package 2: Procurement of the Pingding County 400MW/800MWh energy storage station (200MW/400MWh system equipment) 3. Package 3: Procurement of the Pingding County 400MW/800MWh energy storage station (200MW/400MWh system equipment) [4][5]. Group 3: Bidder Qualifications - Bidders must possess a valid business license and demonstrate adequate capabilities in personnel, equipment, and financial resources [6]. - Financial stability is required, with no bankruptcy or operational issues reported since January 1, 2022 [6]. - Bidders must not be listed as untrustworthy on relevant credit platforms and must provide necessary documentation [7][9]. Group 4: Bidding Process - Bidding documents can be obtained from March 25, 2025, to March 31, 2025, and must be submitted by April 15, 2025 [9][10]. - The opening of bids will occur on April 15, 2025, at a specified location in Beijing [9][10]. Group 5: Supervision and Contact Information - The project will be supervised by the office of State Grid XJ Electric (Beijing) New Energy Technology Co., Ltd. [11]. - Contact details for the bidding entity and the bidding agency are provided for further inquiries [12][13]. Group 6: Industry Event - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, featuring over 800 leading companies and 500 new product launches [14]. - The event aims to attract over 200,000 professional visitors and includes 40+ thematic forums [14][16].
1GWh!国投奇台县180万千瓦风光氢储一体化项目储能系统招标
中关村储能产业技术联盟· 2025-03-26 08:47
Core Viewpoint - The article discusses the procurement announcement for the energy storage system equipment for the National Investment Qitai County 1.8 million kilowatt wind-solar-hydrogen integrated project, highlighting the project's capacity and funding structure [1][2]. Group 1: Project Overview - The project is located in Qitai County, Changji Prefecture, and aims to construct a shared energy storage capacity of 250MW/1000MWh using lithium iron phosphate batteries [3][5]. - The procurement includes various components such as battery cabins, energy management systems (EMS), battery management systems (BMS), and related infrastructure [5]. Group 2: Funding and Procurement Details - The funding for the project is sourced from 20% self-raised funds and 80% bank loans [2]. - The procurement process is open for bids, with specific requirements for bidders, including independent legal status and financial stability [7][9]. Group 3: Bidder Qualifications - Bidders must have independent research and production capabilities for key components like EMS, PCS (power conversion system), and BMS, along with relevant certifications [8][9]. - Bidders should have a good financial status over the past three years and must not be listed as untrustworthy by relevant authorities [9][10]. Group 4: Bid Submission Process - The bidding process is conducted electronically, requiring bidders to register and submit their bids through the Changji Public Resource Trading Network [23][25]. - A bid security deposit of 500,000 yuan is required, and the submission period is specified [15][21]. Group 5: Event Announcement - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) will take place from April 10 to 12, 2025, at the Capital International Exhibition Center, featuring over 800 leading companies and 500 new product launches [32].
22家投标!比亚迪中标河北冀中新能源2025年第一批用户侧储能电池设备招标
中关村储能产业技术联盟· 2025-03-25 07:53
Core Viewpoint - The article highlights the successful bid of BYD for the procurement of user-side energy storage battery equipment in Hebei, amounting to 34.3 million yuan, amidst competition from 20 other companies [1][3]. Group 1: Bid Results - BYD won the bid with a total price of 34,300,000 yuan [1][4]. - Other notable bidders included: - XJ Electric with a bid of 38,700,000 yuan [3]. - Zhuzhou CRRC with a bid of 38,990,000 yuan [4]. - Sunpower with a bid of 38,972,100 yuan [4]. - Hubei Yiwei with a bid of 38,429,959 yuan [3]. Group 2: Upcoming Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, at the Capital International Exhibition Center [5]. - The exhibition will cover over 16,000 square meters, featuring more than 800 leading enterprises and over 500 new product launches, expecting to attract over 200,000 professional visitors [5]. - The event will include 40+ thematic forums with participation from over 400 core policymakers, experts, and industry leaders [5][7].
100MW/300MWh用户侧储能项目开工!广州发展/广州储能/南网科技/上能电气/力神等出席
中关村储能产业技术联盟· 2025-03-25 07:53
Core Viewpoint - The article highlights the commencement of the Huiran Industrial Energy Storage Project, which is the largest user-side energy storage project in China, with a capacity of 100MW/300MWh and a total investment of 240 million yuan [2][4]. Group 1: Project Overview - The Huiran Industrial Energy Storage Project is being developed by Guangzhou Storage Group in collaboration with State Grid Technology Co., Ltd. and aims to provide energy-saving solutions for Jiangsu Huiran Industrial Co., Ltd. [4]. - The project will utilize 314Ah lithium iron phosphate cells and mainstream full liquid cooling technology, connecting to a newly built 220kV substation at a voltage level of 35kV [4]. Group 2: Environmental and Economic Impact - Upon completion, the project is expected to supply 2.6 billion kilowatt-hours of electricity over its lifecycle, reducing carbon emissions by 2.6 million tons and significantly enhancing regional renewable energy consumption [5]. - The project is projected to save the enterprise over 100 million yuan in electricity costs [5]. Group 3: Upcoming Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) will take place from April 10 to 12, 2025, at the Capital International Exhibition Center, featuring over 800 leading companies and 500 new product launches [7]. - The exhibition will cover more than 160,000 square meters and is expected to attract over 200,000 professional visitors, with 40+ thematic forums planned [7][9].