Workflow
铁路CTC2.0系统
icon
Search documents
(新春走基层)高原小站值班员守护“天路”
Zhong Guo Xin Wen Wang· 2026-02-11 06:14
Core Viewpoint - The article highlights the dedication and responsibilities of railway station staff at the Qinghai Lake Station, emphasizing their crucial role in maintaining the safety and efficiency of the Qinghai-Tibet Railway, especially during harsh winter conditions [1]. Group 1: Station Operations - Qinghai Lake Station, located at an altitude of 3,260 meters, is a vital node on the Qinghai-Tibet Railway, despite being a small station without waiting rooms or ticket counters [3]. - The station is staffed by two operators, Zhao Lei and Meng Qingyun, who take turns weekly, with each responsible for monitoring and coordinating train operations [3]. - Key responsibilities include real-time monitoring of track switches, especially during winter when snow and ice can disrupt operations, and coordinating with maintenance teams for timely snow removal [3][5]. Group 2: Working Conditions and Technology - Zhao Lei has been stationed at Qinghai Lake for four years and has 30 years of railway experience, witnessing significant technological advancements [7]. - The transition from the manual 6502 relay interlocking system to the CTC 2.0 system has greatly improved safety, convenience, and work efficiency [7]. - The article notes that the working conditions have improved significantly over the years, reflecting the overall modernization of the Qinghai-Tibet Railway [7]. Group 3: Personal Insights and Aspirations - Zhao Lei engages in simple stretching exercises during breaks to alleviate fatigue, emphasizing the need for focus and alertness in his role [5]. - The article describes the emotional connection Zhao Lei has with the station, highlighting his desire for a zero-failure freight corridor and his commitment to fulfilling his duties alongside his partner [7].