Workflow
铁路智能化
icon
Search documents
(新春走基层)高原小站值班员守护“天路”
Zhong Guo Xin Wen Wang· 2026-02-11 06:14
Core Viewpoint - The article highlights the dedication and responsibilities of railway station staff at the Qinghai Lake Station, emphasizing their crucial role in maintaining the safety and efficiency of the Qinghai-Tibet Railway, especially during harsh winter conditions [1]. Group 1: Station Operations - Qinghai Lake Station, located at an altitude of 3,260 meters, is a vital node on the Qinghai-Tibet Railway, despite being a small station without waiting rooms or ticket counters [3]. - The station is staffed by two operators, Zhao Lei and Meng Qingyun, who take turns weekly, with each responsible for monitoring and coordinating train operations [3]. - Key responsibilities include real-time monitoring of track switches, especially during winter when snow and ice can disrupt operations, and coordinating with maintenance teams for timely snow removal [3][5]. Group 2: Working Conditions and Technology - Zhao Lei has been stationed at Qinghai Lake for four years and has 30 years of railway experience, witnessing significant technological advancements [7]. - The transition from the manual 6502 relay interlocking system to the CTC 2.0 system has greatly improved safety, convenience, and work efficiency [7]. - The article notes that the working conditions have improved significantly over the years, reflecting the overall modernization of the Qinghai-Tibet Railway [7]. Group 3: Personal Insights and Aspirations - Zhao Lei engages in simple stretching exercises during breaks to alleviate fatigue, emphasizing the need for focus and alertness in his role [5]. - The article describes the emotional connection Zhao Lei has with the station, highlighting his desire for a zero-failure freight corridor and his commitment to fulfilling his duties alongside his partner [7].
新疆规模最大智能化程度最高路网性编组站建成投用
Xin Lang Cai Jing· 2026-01-04 19:01
Core Viewpoint - The expansion and upgrade of Hami East Station, which is the largest and most intelligent railway classification yard in Xinjiang, has been completed five months ahead of schedule, enhancing its operational capacity significantly [1] Group 1: Infrastructure Development - Hami East Station's expansion project was initiated on May 10, 2025, in collaboration with local authorities, focusing on increasing the capacity of the station's tracks and upgrading signaling and communication systems [1] - The station plays a crucial role in the Lanzhou-Xinjiang Railway corridor, handling over 70% of the freight trains entering and leaving Xinjiang, thus supporting coal transportation and the operation of China-Europe freight trains [1] Group 2: Capacity Enhancement - The operational capacity of Hami East Station will increase by 1.2 times, with annual freight handling capacity rising from 100 million tons to 178 million tons following the completion of the expansion [1]
佳讯飞鸿:灾害监测系统已成功通过CRCC的认证
Zheng Quan Ri Bao Wang· 2025-08-14 11:13
Core Viewpoint - The company has developed a disaster monitoring system that utilizes new ICT technologies to enhance railway safety through real-time alerts for potential hazards [1] Group 1: Technology and Innovation - The disaster monitoring system relies on big data, IoT sensing, and edge computing technologies [1] - The system significantly improves the railway disaster prevention capabilities and the construction level of the pre-disaster perception and warning system [1] Group 2: Safety and Efficiency - The system can monitor and alert in real-time for natural disasters such as wind, rain, and snow, as well as sudden incidents like foreign object intrusion that threaten high-speed railway operation safety [1] - It effectively ensures the safety of train operations and operational efficiency [1] Group 3: Certification and Validation - The system has successfully passed certification by the China Railway Construction Corporation (CRCC) [1]