锂离子电池正极材料磷酸铁锂前驱体

Search documents
四川年产10万吨锂离子电池正极材料磷酸铁锂前驱体技改项目公示
鑫椤锂电· 2025-07-31 07:55
关注公众号,点击公众号主页右上角" ··· ",设置星标 "⭐" ,关注 鑫椤锂电 资讯~ 该项目选址四川蓬溪经济开发区(金桥片区),盈达锂电计划投资3000万元在现有厂区内进行技术改造, 最终形成年产10万吨锂离子电池正极材料磷酸铁锂前驱体的生产能力。 进固态电池群 ,加小编微信:13248122922 注:添加好友请备注 公司名称、姓名、职务,入群需发送1张您的纸质名片~ END 本文来源: 蓬溪生态环境局 7月28日,四川蓬溪生态环境局披露了《 四川省盈达锂电新材料有限公司10万吨/年锂离子电池正极材料 磷酸铁锂前驱体技改项目 环境影响评价公众参与报批前公示》。 ...
四川遂宁10万吨磷酸铁项目落地!
鑫椤锂电· 2025-06-30 07:59
Core Viewpoint - The article discusses the environmental impact assessment (EIA) public announcement for the technological transformation project of Sichuan Yingda Lithium Battery New Materials Co., Ltd., which aims to enhance the production capacity of lithium-ion battery cathode material lithium iron phosphate precursor to 100,000 tons per year [2] Group 1 - The project is located in the Pengxi Economic Development Zone, with an investment of 30 million yuan for technical upgrades within the existing factory [2] - The construction plan includes optimizing the existing production capacity of 40,000 tons of sodium-based iron phosphate and 60,000 tons of ammonium-based iron phosphate to a total of 100,000 tons of ammonium-based iron phosphate [2] - The project will be executed in three phases, with the first phase (one production line) achieving a capacity of 25,000 tons per year, already accepted, and the second phase (two production lines) reaching 50,000 tons per year, totaling 75,000 tons [2] Group 2 - The second workshop will be developed in the third phase, adding a fourth production line with a capacity of 25,000 tons, achieving a total production capacity of 100,000 tons [2] - The project will enhance raw material supply autonomy by replacing externally sourced monoammonium phosphate with a reaction process using ammonia water and dilute phosphoric acid [2] - Energy-saving upgrades will be implemented in the drying section, along with the addition of waste gas treatment systems and other environmental protection facilities [2]
四川年产10万吨锂离子电池正极材料磷酸铁锂前驱体项目环评公示
鑫椤锂电· 2025-06-26 07:22
Group 1 - The article discusses the environmental impact assessment draft for the technical transformation project of Sichuan Yingda Lithium Battery New Materials Co., Ltd., which aims to produce 100,000 tons/year of lithium-ion battery cathode material lithium iron phosphate precursor [1] - The project involves an investment of 30 million yuan for optimizing the industrial route and capacity integration, adjusting the existing production capacity from 40,000 tons of sodium-based lithium iron phosphate and 60,000 tons of ammonium-based lithium iron phosphate to 100,000 tons of ammonium-based lithium iron phosphate [1] - The construction will be carried out in three phases, with the first phase involving a production line with a capacity of 25,000 tons/year, the second phase adding two more production lines for a total of 50,000 tons/year, and the third phase adding another production line for an additional 25,000 tons/year [1] Group 2 - The project will enhance the self-sufficiency of raw material supply by replacing externally sourced monoammonium phosphate with a reaction process using ammonia water and dilute phosphoric acid [1] - Energy-saving upgrades will be implemented in the drying section, along with the addition of a waste gas treatment system and other environmental protection facilities [1] - Upon completion, the project will achieve an annual production capacity of 100,000 tons of lithium-ion battery cathode material lithium iron phosphate precursor, relying on existing project facilities [1]