Workflow
1175Ah长时储能电芯
icon
Search documents
菏泽|民营企业跑出“菏泽加速度”
Da Zhong Ri Bao· 2025-08-21 00:41
Core Viewpoint - The construction of the Haicheng Energy Storage base in Heze, Shandong, is progressing rapidly, aiming to become the world's first integrated zero-carbon long-duration energy storage industrial park, supported by both visible and invisible resources from the local government [2][3][5]. Group 1: Project Development - The Haicheng Energy Storage base has achieved significant milestones, with the module factory fully topped out and the cell factory expected to reach the same status by the end of September [3][5]. - The project aims to produce 30GWh of energy storage batteries and 20GWh of energy storage systems annually once fully operational, contributing to the development of a new highland for the energy storage industry in Shandong [3][4]. Group 2: Government Support - The local government has prioritized the Haicheng project, providing tailored high-standard services, completing land acquisition in 30 days, and expediting planning and construction permits [5][6]. - The government has introduced 32 new energy equipment manufacturing projects with a total investment exceeding 50 billion, enhancing the industrial ecosystem in Heze [5][6]. Group 3: Industry Impact - The Haicheng base is positioned to strengthen Shandong's core status in the global energy storage industry and accelerate the achievement of carbon neutrality goals [3][5]. - The region's new energy installed capacity accounts for 63.6% of the total power installed capacity, ranking third in the province, indicating a robust growth in the renewable energy sector [5][6].