2×1000兆瓦燃煤机组
Search documents
甘肃能源(000791.SZ):常乐公司2×1000兆瓦燃煤机组扩建项目5号机组正式投入商业运营
智通财经网· 2025-09-07 09:54
Core Viewpoint - Gansu Energy's subsidiary, Gansu Electric Power Changle Generation Co., has successfully completed the 5th unit of its 2×1000 MW coal-fired power expansion project, which began commercial operation on September 6, 2025, contributing over 10% to the company's total installed capacity by the end of 2024 [1] Company Summary - Gansu Energy announced that its subsidiary, Gansu Electric Power Changle Generation Co., has reported the successful completion of the 5th unit of its coal-fired power expansion project [1] - The 5th unit has a total installed capacity of 1000 MW, which represents more than 10% of the company's total installed capacity expected by the end of 2024 [1] - The project is located in the Liugou Logistics Park in Guazhou County, Jiuquan City, Gansu Province [1]
甘肃能源:常乐公司2×1000兆瓦燃煤机组扩建项目5号机组正式投入商业运营
Zheng Quan Shi Bao Wang· 2025-09-07 08:56
Core Viewpoint - Gansu Energy's subsidiary, Gansu Electric Power Changle Generation Co., has successfully completed the full-load trial operation of its 2×1000 MW coal-fired unit expansion project, marking a significant milestone for the company as it officially enters commercial operation [1] Group 1 - The 5th unit of the expansion project was put into commercial operation on September 6, 2025, after passing a 168-hour full-load trial run [1] - The total installed capacity of the 5th unit is 1000 MW, which accounts for over 10% of the company's projected installed capacity by the end of 2024 [1]