OH1泵机组

Search documents
中阿合作新标杆!KSB助力阿尔及利亚MTBE项目圆满交付|全球技术实力再获验证
凯士比· 2025-05-26 09:58
Core Viewpoint - The successful delivery of the Algeria MTBE project marks a significant milestone in Sino-Algerian cooperation in the petrochemical sector, showcasing KSB's advanced pump technology and project management capabilities [3][21]. Project Overview - The Algeria Sonatrach MTBE project, jointly constructed by CNTIC and LPEC, has entered a full implementation phase with the delivery of the first OH1 pump units [3]. - KSB, as the core equipment supplier, overcame challenges such as language barriers and strict certification requirements, injecting "Chinese manufacturing" momentum into the project [5]. Technical Breakthroughs - The project required international collaboration, with technical documentation needing to be prepared and delivered in both English and French, highlighting the high demands for cross-border cooperation efficiency [7]. - KSB achieved a 100% pass rate in meeting the stringent French ARH certification standards, which involved independent third-party audits at every stage from design to production [8]. Project Milestones - Key milestones include the initial quotation, establishment of the technical route, signing of equipment procurement contracts, delivery of the first products, and completion of all ARH certifications, with significant dates spanning from September 2023 to May 2025 [9]. Innovation and Management - KSB's Shanghai R&D team developed customized solutions for the MCPK pump model, which were successfully validated and applied in this project, setting a benchmark for similar pump technology upgrades [12]. - A cross-departmental special team was formed to ensure compliance with Sonatrach's "zero deviation" principle, enhancing design reliability and coordinating resources from 35 global production bases [13]. Global Network Support - KSB established five major spare parts warehouses across four continents to support Sinopec's overseas strategy, ensuring rapid response to urgent local project needs and reducing logistics costs through localized warehousing [14][16]. - The project represents a breakthrough in integrating KSB's MCPK pump with turbine units, providing a new path for the localization of equipment in Sinopec's overseas projects [18]. Industry Benchmark Effect - The project serves as a model for the integration of international brand technology with Chinese central enterprise collaboration, providing dual guarantees of technical compliance and cost competitiveness for "Chinese equipment" entering the high-end energy market in Africa [18].