水利工程建设
Search documents
青龙管业:中标宁夏青铜峡灌区现代化改造工程2025年度第二批建设项目,中标金额8733.82万元
Xin Lang Cai Jing· 2025-09-11 08:24
Group 1 - The company, Qinglong Pipe Industry, has received a bid notification confirming it as the winning bidder for the modernization project of the Qingtongxia Irrigation District in Ningxia for the year 2025, with a bid amount of 87.3382 million yuan [1] - The winning bid represents 3.10% of the company's audited operating revenue for the year 2024, indicating a significant contribution to future revenues [1] - The project is expected to have a certain impact on the company's performance in the years 2025 to 2026 [1]
青龙管业中标8733.82万元项目
Zhi Tong Cai Jing· 2025-09-11 08:20
Core Viewpoint - Qinglong Pipe Industry (002457.SZ) has been awarded a contract for the modernization project of the Qingtong Gorge irrigation area in Ningxia, which is expected to positively impact the company's performance in 2025 and 2026 [1] Summary by Categories Company Announcement - The company received a "Notice of Winning Bid" from the Ningxia Hui Autonomous Region Water Conservancy Engineering Construction Center [1] - The awarded contract amount is 87.3382 million yuan, which represents 3.10% of the company's audited operating revenue for the year 2024 [1] Financial Impact - The project is anticipated to have a significant effect on the company's performance for the years 2025 and 2026 [1]
青龙管业:中标金额8733.82万元项目
Xin Lang Cai Jing· 2025-09-11 08:17
Core Points - Company has received a bid notification confirming it as the winning bidder for the modernization project of the Qingtongxia irrigation area in Ningxia for the year 2025 [1] - The winning bid amount is 87.3382 million yuan, which represents 3.10% of the company's audited total revenue for the year 2024 [1] - The supply period is set to commence on September 20, 2025, and the project is expected to impact the company's performance in 2025 and 2026 [1]
贾鲁河综合治理工程通过竣工验收
He Nan Ri Bao· 2025-08-29 23:19
Core Points - The Jia Lu River Comprehensive Management Project has successfully passed the completion acceptance, marking the transition to operational management [1] - The project aims to address flood disasters in the Jia Lu River basin and enhance flood control and drainage capabilities [1][2] - The total investment for the project is 7.244 billion yuan, with a construction period of 25 months [2] Group 1 - The Jia Lu River is a significant river in Eastern Henan, facing issues such as low flood control standards and insufficient flood discharge capacity [1] - The project was initiated as a key water conservancy project following the severe flooding in July 2021, with the Henan Water Investment Group responsible for its implementation [1][2] - The project includes the management of 148.57 kilometers of the Jia Lu River main stream and 153.84 kilometers of the Shuangjie River, along with the construction of 249 various structures [2] Group 2 - The project has successfully withstood multiple significant flood events, ensuring safe flood passage and reducing inundated farmland by over 400,000 acres [2] - In response to drought conditions this year, the project’s six river barriers have played a crucial role in water conservation and irrigation [2]
高温督查保质量 筑牢安全防护网 两项省重点水利工程建设项目稳步推进
Zhen Jiang Ri Bao· 2025-08-25 17:14
Group 1 - The construction of two key water conservancy projects in Yangzhong City is progressing well, with a focus on enhancing regional water safety and environmental quality [1][2] - The Tuanjie Port Lock Station project aims to improve flood control standards to a "1 in 100 years" level and drainage capacity to a "1 in 20 years" level, with completion expected by the end of September [1] - The second phase of emergency governance for the Yangzhong River section includes stabilizing the riverbank and protecting critical infrastructure, with a total investment of approximately 70 million yuan for the first half of the year [2] Group 2 - The construction team has faced challenges such as high temperatures and flooding, yet they have made significant progress, completing 56% of the work by mid-August [2][3] - The inspection team conducted a thorough review of the construction quality and safety management, providing feedback and requiring timely rectifications for identified issues [3]
总库容5.62亿立方米 广东黄茅峡水库工程开工建设
news flash· 2025-07-22 06:00
Core Viewpoint - The Guangdong Huangmaoxia Reservoir project has commenced construction, marking a significant milestone in the national "Two Major" infrastructure initiative, aimed at enhancing flood control capabilities in the Guangdong-Hong Kong-Macao Greater Bay Area [1] Group 1: Project Overview - The Huangmaoxia Reservoir is a crucial component of the North River flood control system in Guangdong, designed to alleviate flood pressure in cities like Guangzhou and Foshan [1] - The reservoir will have a total capacity of 562 million cubic meters, with a flood control capacity of 547 million cubic meters and a normal water level of 45 meters [1] - The estimated total investment for the project is 13.5 billion yuan [1] Group 2: Engineering Components - The project includes key structures such as a spillway, power station, ship lock, fishway, and connecting dams on both banks [1]
50人的44小时
He Nan Ri Bao· 2025-05-02 23:27
Core Viewpoint - The construction of the Xiaoplatform Reservoir expansion project is progressing rapidly, with significant milestones achieved, including the successful pouring of the foundation for the spillway gate after 44 hours of continuous work [1][3]. Group 1: Project Overview - The Xiaoplatform Reservoir expansion project is a major water conservancy initiative included in the national "14th Five-Year" water security plan, aimed at enhancing flood control, irrigation, and water supply capabilities [3]. - The project manager, Yan Meng, emphasized the urgency of the construction to ensure the reservoir's safety during the upcoming flood season, with a target completion date set for the end of the year [4][5]. Group 2: Construction Details - The foundation for the spillway gate required 1,400 cubic meters of concrete, which needed to be poured in a single continuous operation to avoid quality issues [3]. - The construction team, consisting of 50 workers, operated continuously, with shifts planned to maintain momentum throughout the night [3][5]. Group 3: Operational Challenges - Yan Meng monitors the construction site remotely during late hours to ensure safety and productivity, particularly during times when workers may be fatigued [4][5]. - The project is currently in a critical phase, referred to as the "golden period" for construction, with efforts focused on meeting the flood preparedness requirements by May 15 [5].