大石峡水利枢纽工程
Search documents
 国庆出行“加速度” 多地工程建设加紧推进
 Yang Shi Xin Wen· 2025-10-01 18:32
 Group 1 - The construction of the Baolan Railway expansion project from Yinchuan to Zhongwei has commenced, which is part of the national "14th Five-Year" plan and a significant railway project [3] - The project spans 123 kilometers and is expected to be completed in 3.5 years, connecting with the Baozhong Railway to facilitate direct train service from Yinchuan to Guyuan, reducing travel time to approximately 3 hours [3]   Group 2 - The Dashi Gorge Water Conservancy Hub project in the Aksu region of Xinjiang has a maximum dam height of 247 meters and has been under construction since November 2019, with the main structure completed [6] - The project is expected to be operational by October 2026, providing water regulation to improve the conditions of the Tarim River and ensuring water supply for over 6.8 million acres of farmland and large areas of poplar forest in the region [8]
 世界最高,下闸蓄水!
 中国能源报· 2025-09-20 08:15
 Core Viewpoint - The Dashi Gorge Water Conservancy Project in Xinjiang has officially entered the water storage phase, marking a significant milestone in its construction and operational readiness [1][3].   Group 1: Project Overview - The Dashi Gorge Water Conservancy Project is located in the Aksu region of Xinjiang and features the world's highest concrete-faced rockfill dam, with a maximum height of 247 meters, equivalent to over 80 stories [3]. - The dam's construction involved a total fill volume of 1,890,000 cubic meters, which could fill over 7,000 standard swimming pools [3]. - The project plans to install three 250,000-kilowatt turbine generator sets, with a total installed capacity of 750,000 kilowatts [3].   Group 2: Economic and Environmental Impact - Once completed, the project is expected to generate over 1.8 billion kilowatt-hours of clean electricity annually, sufficient to meet the annual electricity needs of 65,000 households [5]. - The project will provide a stable water source for agricultural irrigation in the Aksu region, which is crucial for the production of crops such as paper-shelled walnuts, apples, and jujubes [5]. - The project will also contribute 3.42 billion cubic meters of ecological water to the Tarim River annually, improving the ecological environment of the river basin and alleviating water shortages in over 8 million acres of downstream irrigation areas [5].   Group 3: Project Timeline - The Dashi Gorge Water Conservancy Project commenced construction in November 2019, with the dam expected to be completed by December 2024 and full operation planned for 2026 [5].
 各地“十四五”重点工程建设加速推进
 Yang Shi Wang· 2025-08-19 12:17
 Group 1 - The completion of the Hanjiang Grand Bridge marks the finishing of the main bridge and tunnel works for the Xi'an to Shiyan high-speed railway, which is approximately 255.7 kilometers long and will reduce travel time from Xi'an to Wuhan from 5 hours to about 2.5 hours upon opening next year [1] - The expansion and renovation of the Jianbi Ship Lock on the Suzhou section of the Grand Canal will allow for a maximum annual cargo throughput of 170 million tons, which is 2.5 times that of the old lock, enabling 2,000-ton vessels to navigate the waterway [3] - The successful completion of the main bridge of the Fuhua Railway, which spans 142.5 kilometers, will reduce travel time from Fuyang to Huaibei from 2 hours to half an hour when it opens in 2026 [5]   Group 2 - The Liaoyang irrigation district in Liaoning has been fully completed, providing irrigation for over 100,000 acres of farmland and increasing annual water-saving capacity by over 9 million cubic meters, which is an improvement of over 10% compared to before implementation [7] - The Dashi Gorge Water Conservancy Hub project in the Aksu region of Xinjiang, part of 172 major water-saving supply projects, is nearing 90% completion and is in the final stages of construction, with plans to store water by the end of September [7]