交通基建互联互通

Search documents
向祖国报告丨狮子洋通道建设正酣 又一超级工程初显“真身”
Yang Guang Wang· 2025-10-05 12:47
Core Viewpoint - The construction of the Lion Rock Channel is a significant infrastructure project in the Guangdong-Hong Kong-Macao Greater Bay Area, aimed at enhancing connectivity and supporting high-quality economic development in the region [1][7]. Group 1: Project Overview - The Lion Rock Channel is a key transportation project connecting Nansha in Guangzhou to Humen in Dongguan, spanning approximately 35 kilometers with a dual-layer design featuring 16 lanes, significantly increasing traffic capacity [2][7]. - The project includes the Lion Rock Bridge, which utilizes a double-layer steel truss suspension bridge design with a main span of 2,180 meters, eliminating the need for bridge piers in the river [2][3]. Group 2: Construction Progress - As of October 2023, construction is in full swing, with critical processes being maintained during the National Day holiday, showcasing a commitment to timely project completion [2][6]. - The main tower of the Lion Rock Bridge has reached a height of 342 meters, equivalent to a 110-story building, and is constructed using a combination of steel and concrete to enhance stability and reduce weight [4][6]. Group 3: Technical Challenges and Innovations - The project faces significant technical challenges due to its unprecedented scale, requiring innovations in design, construction techniques, and equipment development [3][4]. - Advanced technologies, such as high-precision positioning systems and intelligent control systems, are employed to ensure the accuracy and safety of the construction process [6][7]. Group 4: Future Outlook - The year 2025 is projected to be a peak construction period for the Lion Rock Channel, with major engineering milestones expected to be achieved [7]. - Upon completion, the channel is anticipated to alleviate traffic pressure across the Pearl River and play a crucial role in the integrated high-quality development of the Greater Bay Area [7].