Workflow
区域铁路网完善
icon
Search documents
金建高铁兰建段启动试运行 预计2026年一季度具备开通条件
Mei Ri Shang Bao· 2025-12-28 22:15
Group 1 - The first trial run of the Jinjian High-speed Railway's Lanjian section commenced on December 26, marking the start of the trial operation phase, with official opening expected soon [1] - The trial operation will last approximately one month, simulating the actual operational state of the railway to provide scientific data for its official launch [1] - The Jinjian High-speed Railway spans 64.51 kilometers with a design speed of 250 km/h, connecting key cities and featuring four stations, including two newly constructed ones [1] Group 2 - The Jinjian High-speed Railway is a crucial part of the Huangshan to Jinhua railway corridor, catering primarily to medium and long-distance passenger flows while also supporting intercity tourism [2] - Once operational, the railway will connect with other major lines, enhancing the regional railway network and promoting tourism and economic development in the surrounding areas [2] - The project is expected to significantly improve the flexibility of railway transport organization and facilitate the development of tourism resources along the route [2]
金建高铁兰建段启动热滑试验
Hang Zhou Ri Bao· 2025-11-18 03:00
Core Points - The first hot sliding test train departed from Jiande Station on November 17, marking the initiation of the hot sliding test for the Jinjian High-speed Railway from Lanxi to Jiande, which is a crucial step for subsequent joint debugging and testing [1] - The hot sliding test is conducted under a 27.5 kV electrified railway system, with the test train running at a speed not exceeding 80 km/h to assess key parameters such as bow-wire matching, voltage stability, and current collection quality [1] - The Jinjian High-speed Railway spans 64.51 kilometers with a design speed of 250 km/h, connecting four stations, including two newly built stations, and is expected to be operational by the first quarter of 2026 for the Lanxi to Jiande section [1] Industry Impact - Upon completion, the Jinjian High-speed Railway will connect with the Hangzhou-Changsha High-speed Railway and the Shanghai-Kunming High-speed Railway, enhancing the regional railway network and promoting economic development in tourism and urban areas [2] - The railway is expected to facilitate the development of the "Yellow Mountain Tourism Economic Circle" and the "Central Zhejiang Urban Cluster," contributing to high-quality economic and social growth along the route [2]
500米“钢铁长龙”就位 金建高铁建设加速
Mei Ri Shang Bao· 2025-08-12 22:25
Group 1 - The Jin Jian High-speed Railway has officially entered the long rail storage phase with the arrival of a 500-meter long rail transport train at the Lankxi East Station [1] - The railway segment from Lankxi East to Jiande Station has a total length of 43.5 km, with 87.1 km of main line track laid, 6.63 km of station line track, and 30 sets of turnouts [1] - The Jin Jian Railway, which connects Jinhua and Jiande, is a crucial transportation link with a total length of 64.51 km and a design speed of 250 km/h [1] Group 2 - Upon completion and operation, the Jin Jian High-speed Railway will connect multiple economic circles, including the Huangshan Tourism Economic Circle and the Central Zhejiang Urban Agglomeration [2] - The railway will significantly enhance travel efficiency for residents in the western part of Hangzhou, allowing direct access to Lankxi without the need to detour to Hangzhou East Station [2] - The travel time will be greatly reduced compared to the current 2-hour self-driving or the need for transfers on conventional trains [2]