Workflow
基础设施建设促进经济发展
icon
Search documents
中企承建的运河第四大桥让巴拿马人倍感自豪
Ren Min Ri Bao· 2025-11-02 22:21
Core Points - The construction of the fourth bridge over the Panama Canal, undertaken by a joint venture of China Communications Construction Company and China Harbour Engineering Company, has reached a significant milestone with the commencement of concrete pouring for the first layer of the tower foundation on November 1 [1] - The project is expected to be completed by October 2028, with overall progress exceeding 27%, aligning with the anticipated timeline [1] - The fourth bridge is described as the most important engineering project in Panama, enhancing connectivity between North and South America and significantly improving the living conditions for approximately 2 million residents along the riverbanks [1] Project Details - The main bridge will feature a double-tower, double-cable-stayed structure, measuring 965 meters in length, with the towers standing 186 meters high in an "H" shape [1] - This project represents the largest single bridge project undertaken by Chinese enterprises in Latin America and is the largest economic cooperation project between China and Panama [1] - During the construction phase, the project is expected to create 3,000 direct jobs and additional indirect employment opportunities [1]
“我们岛上有了现代化公路”(共创繁荣发展新时代)
Ren Min Ri Bao· 2025-07-14 22:03
Core Viewpoint - The completion of the first phase of the road project on Pentecost Island, Vanuatu, significantly enhances local connectivity, boosts economic activity, and improves access to essential services, demonstrating the positive impact of infrastructure development on rural communities [1][2]. Group 1: Economic Impact - The road project, spanning 28.3 kilometers, has reduced transportation time for farmers from half a day to less than one hour, significantly lowering transportation costs [1]. - The upgrade has increased tourist access to local attractions, reducing travel time from the airport to a popular village from one hour to ten minutes, leading to a rise in local businesses and improved living conditions for residents [1]. Group 2: Social Benefits - The project has improved access to healthcare, allowing more patients to receive timely treatment at the largest clinic on the island, which was previously hindered by poor road conditions [2]. - Local employment was generated during the construction phase, with over 400 local workers acquiring new skills, contributing to long-term economic benefits for the community [2].