Workflow
巷道式通风体系
icon
Search documents
宜兴高铁全线桥隧工程主体工程完工
Xin Hua She· 2026-01-22 02:22
Core Viewpoint - The completion of the Xingshan East Tunnel marks a significant milestone for the Yichang-Xingshan high-speed railway, which is a crucial part of the "Eight Vertical and Eight Horizontal" high-speed rail network in China, facilitating regional connectivity and reducing travel times [1] Group 1: Project Overview - The Yichang-Xingshan high-speed railway spans 108 kilometers with a bridge-tunnel ratio of 95.13% [1] - The Xingshan East Tunnel is the longest tunnel on the line, measuring 16.88 kilometers and traversing seven fault zones with a maximum depth of 1,256 meters, indicating a complex geological environment [1] Group 2: Technical Innovations - To address construction challenges, participating parties collaborated with research institutions to develop innovative technologies, including the "anchor cable + steel belt traction" method to stabilize fractured rock masses [1] - The project team modified the traditional ventilation system to a tunnel-style ventilation system to mitigate gas explosion risks, ensuring smooth construction in high-gas sections [1] Group 3: Connectivity and Impact - Upon completion, the Yichang-Xingshan high-speed railway will connect with the Wuhan to Yichang segment of the Shanghai-Chongqing high-speed railway and the Zhengzhou-Chongqing high-speed railway, enhancing regional transport links [1] - Travel time from Yichang to Xingshan will be reduced to 20 minutes, and the shortest travel time from Wuhan to Chongqing is expected to be compressed to 4 hours, transforming Xingshan from a transit area into a regional hub [1]