Workflow
广州都市圈
icon
Search documents
广佛边界规划了18年的大桥何时动工?回应:正持续推进立项
Nan Fang Du Shi Bao· 2025-08-05 00:34
Core Viewpoint - The construction of the Chenxiang Bridge, a key infrastructure project aimed at enhancing connectivity between Guangzhou and Foshan, has faced significant delays, with planning and environmental assessments extending over 18 years, raising concerns about the pace of urban integration in the region [1][2][9]. Group 1: Project Background - The Chenxiang Bridge is part of a broader initiative to facilitate urban integration between Guangzhou and Foshan, which has been a focus since the early 2000s [6][7]. - The bridge is intended to connect key areas in both cities, enhancing transportation and economic interactions, particularly for the densely populated Jinsha Island area [3][8]. Group 2: Current Status and Challenges - As of 2024, the project has not yet commenced construction, despite plans for it to start in January 2025 and be completed by December 2028 [4][11]. - The project has been stalled due to complex issues related to environmental protection, public opposition, and the need for extensive planning and coordination between the two cities [9][10][12]. Group 3: Public Sentiment and Impact - Local residents express frustration over the prolonged delays, highlighting ongoing traffic congestion and the inadequacy of existing transportation infrastructure [5][6]. - The population in the Jinsha area has grown to nearly 400,000, intensifying the demand for improved transportation links [8][14]. Group 4: Future Prospects - Experts suggest that the successful construction of the Chenxiang Bridge is crucial for the future development of the Guangzhou-Foshan metropolitan area, emphasizing the need for collaborative efforts between the two cities to overcome bureaucratic hurdles [12][13][14]. - The bridge is seen as a vital component in achieving the broader goals of urban integration and economic development in the region, with potential benefits for local residents and businesses [8][14].