Workflow
水资源调控
icon
Search documents
松辽水利委员会持续强化西辽河流域水工程运行监管
Shui Li Bu Wang Zhan· 2025-09-22 14:39
Core Viewpoint - The Songliao Water Conservancy Committee is focusing on "water security" as a core task, enhancing the management of the watershed through scientific planning and precise implementation of measures to support ecological restoration and water security in the Xiliao River basin [1][2]. Group 1 - External water sources are being adjusted to introduce new momentum, with the Zhanguo-Jiliao project serving as a strategic water source for continuous flow in the lower reaches of the Xiliao River, ensuring reliable water supply [1]. - The East Taizi Reservoir is crucial for water resource regulation, and the success of land acquisition and resettlement efforts is vital for its operational efficiency, significantly enhancing the reservoir's water storage and regulation capabilities [1]. Group 2 - Digital empowerment is being utilized to create a smart monitoring system, enhancing real-time monitoring of key water projects in the Xiliao River basin, which supports scientific water resource scheduling and risk management during flood seasons [2]. - Safety reinforcement measures are being implemented to ensure the secure operation of water projects, with a focus on the safety assessment of critical water control structures and their inclusion in future investment plans [2]. Group 3 - Detailed management practices are being adopted to ensure the effective operation of water storage and regulation projects, with regular safety guidance and maintenance checks on important water infrastructure to eliminate flow obstacles [2].
北京六水联通蓄滞洪区三标项目首个泵站主体结构浇筑完成
Huan Qiu Wang· 2025-09-15 06:07
Core Viewpoint - The completion of the first pump station's main structure for the Beijing Liushui Linked Flood Storage Area Project marks a significant milestone, providing valuable practical experience and guidance for standardized construction in future projects [1] Project Overview - The project is located in the Mentougou District of Beijing and includes the renovation of the Chenglong Canal (3.9 km), construction of six new water supply pump stations, 15.5 km of water supply pipelines, two new drainage pump stations, three sluices, one management center, and landscaping recovery [1] - The completed pump station is situated in the Longquan Town area and serves as a core hub for the Liushui Linked Flood Storage Area Project, facilitating water circulation from the Yongding River to the upstream water supply station [1] Construction Management - During the construction period, the project team proactively planned and coordinated efforts, optimizing construction plans based on project characteristics [1] - Strict adherence to construction specifications was maintained, with precise control over key parameters such as concrete mix ratio, slump, pouring speed, and temperature, allowing for dynamic adjustments to ensure concrete pouring quality met standards [1] Impact on Water Resource Management - The project is crucial for improving the water resource regulation capacity in the Mentougou District, addressing issues of disconnected water systems, insufficient water volume, and unstable water quality in the New Town area [1] - The initiative aims to create a "highly efficient, green, intelligent, smoothly circulating, and orderly regulated" water network, laying a solid foundation for achieving the goal of a safe and resilient Mentougou [1]
北京温榆河生态治理工程鲁疃辛堡两闸即将通水
Shui Li Bu Wang Zhan· 2025-05-27 06:30
Core Points - The completion of the main structure and installation of metal equipment for the Lutuan and Xinbao sluices marks a significant milestone in the ecological governance project of the Wenyu River, enhancing flood control and water resource management capabilities [1][2] - The Wenyu River ecological governance project is part of the second phase of the Wenyu River Park construction and is included in Beijing's key projects for 2024 and 2025, focusing on flood control, ecological restoration, and landscape greening [1][2] - The Wenyu River Park serves as an important flood retention area in Beijing's flood control planning, contributing to the overall flood management system in the North Canal basin [3] Project Details - The Lutuan sluice has 3 gates, while the Xinbao sluice has 7 gates, totaling 10 gates that have undergone successful testing for stability and operational efficiency [2] - The sluices will play a crucial role in regulating floodwaters and managing water resources, thereby ensuring the safety of residents and promoting sustainable water environment development [2] - The project management team has effectively coordinated design, construction, and supervision to overcome challenges such as tight schedules and complex construction environments [2] Future Management - The Beijing water authority will closely monitor water conditions during the flood season to ensure optimal operation of the sluices, providing robust support against extreme weather events during peak flood periods [2]