北京六水联通蓄滞洪区三标项目泵站
Search documents
北京六水联通蓄滞洪区三标项目首个泵站主体结构浇筑完成
Huan Qiu Wang· 2025-09-15 06:07
Core Viewpoint - The completion of the first pump station's main structure for the Beijing Liushui Linked Flood Storage Area Project marks a significant milestone, providing valuable practical experience and guidance for standardized construction in future projects [1] Project Overview - The project is located in the Mentougou District of Beijing and includes the renovation of the Chenglong Canal (3.9 km), construction of six new water supply pump stations, 15.5 km of water supply pipelines, two new drainage pump stations, three sluices, one management center, and landscaping recovery [1] - The completed pump station is situated in the Longquan Town area and serves as a core hub for the Liushui Linked Flood Storage Area Project, facilitating water circulation from the Yongding River to the upstream water supply station [1] Construction Management - During the construction period, the project team proactively planned and coordinated efforts, optimizing construction plans based on project characteristics [1] - Strict adherence to construction specifications was maintained, with precise control over key parameters such as concrete mix ratio, slump, pouring speed, and temperature, allowing for dynamic adjustments to ensure concrete pouring quality met standards [1] Impact on Water Resource Management - The project is crucial for improving the water resource regulation capacity in the Mentougou District, addressing issues of disconnected water systems, insufficient water volume, and unstable water quality in the New Town area [1] - The initiative aims to create a "highly efficient, green, intelligent, smoothly circulating, and orderly regulated" water network, laying a solid foundation for achieving the goal of a safe and resilient Mentougou [1]