Workflow
海上风电+海洋牧场融合模式
icon
Search documents
携手逐浪深蓝世界
Jing Ji Ri Bao· 2025-09-24 22:46
Core Insights - Fujian Province is rapidly developing offshore wind power, leveraging its favorable geographical conditions and aiming to become a national leader in this sector [1][2]. Group 1: Offshore Wind Power Development - The offshore wind farm in Fujian has 59 turbines that have been operational since 2017, generating an annual output of 1.2 billion kilowatt-hours [1]. - By 2025, Fujian's offshore wind power installed capacity is expected to reach 3.818 million kilowatts, accounting for 4.25% of the total installed capacity in the province [2]. - The Fujian offshore wind power industry park has attracted numerous upstream and downstream enterprises, forming a complete industrial chain with an output value of approximately 6 billion yuan [1]. Group 2: Technological and Infrastructure Challenges - The main challenge for offshore wind power development is the technical bottleneck related to the increasing distance from shore, which affects the efficiency and stability of power transmission [3]. - Existing transmission corridors are scarce, and the construction of dense grid frameworks has led to significant short-circuit current issues, limiting large-scale energy delivery and consumption [3]. - The equipment must withstand extreme environmental conditions, such as frequent typhoons and high corrosion levels in marine environments, which poses a significant challenge for durability [3]. Group 3: Future Plans and Innovations - The State Grid Fujian Electric Power Company is actively collaborating with various parties to advance the construction of a gigawatt-level offshore wind power output base [2]. - Plans include the development of a "four-way interconnected" power hub and a new generation of dispatch technology support systems to enhance the smart grid [2]. - An innovative "offshore wind power + marine ranching" model is being explored, which utilizes the space around wind turbine foundations for aquaculture, thereby increasing the economic viability of the project [1].