Workflow
油气管道建设
icon
Search documents
桂气入滇!这条国家能源基础设施建设工程进度已过半
Yang Shi Wang· 2025-11-11 03:27
Core Viewpoint - The construction of the Guangxi LNG pipeline project is progressing rapidly, with over 50% completion and significant advancements in technology and ecological protection measures, aimed at enhancing energy supply and optimizing the regional energy structure in Yunnan [1][3][5]. Group 1: Project Overview - The Guangxi LNG pipeline project spans 346.8 kilometers, starting from Baise, Guangxi, and ending in Yanshan, Yunnan, with a designed annual gas transmission capacity of 1 billion cubic meters [1]. - The project is expected to be fully operational by 2026, significantly improving Yunnan's resource import capacity and contributing to the region's economic development [1][5]. Group 2: Construction Progress - As of now, the project has surpassed 50% completion, with over 263 kilometers of welding completed since its commencement in August 2024 [1]. - The construction faces challenges due to complex terrain, including the crossing of rivers, mountains, and existing infrastructure, which has led to the adoption of advanced technologies and intelligent management systems [3]. Group 3: Ecological Protection - The project incorporates ecological protection measures, avoiding 11 ecologically sensitive areas and utilizing innovative techniques to prevent soil erosion [5]. - A total of over 1,200 acres of vegetation have been restored as part of the ecological management strategy, ensuring a balance between construction and environmental sustainability [5]. Group 4: Strategic Importance - The pipeline will serve as a key channel for natural gas supply in Southwest China, introducing surplus LNG resources from Guangxi and forming a dual-source supply system with the China-Myanmar oil and gas pipeline [5]. - Once operational, the pipeline will alleviate Yunnan's reliance on a single gas source, enhancing the region's energy security and optimizing its energy structure [5].
中油工程(600339.SH)子公司签署5.13亿美元阿联酋LNG输送管线项目合同
智通财经网· 2025-09-21 07:46
Core Viewpoint - China National Petroleum Engineering Co., Ltd. (CNOOC) has signed an EPC contract worth $513 million (approximately 3.688 billion RMB) with ADNOC Gas for the UAE LNG pipeline project, which is expected to positively impact the company's revenue and profit over the next 3-4 years [1] Group 1 - The contract is for the construction of natural gas pipelines for the Bab and Bu Hasa oil fields in Abu Dhabi [1] - The construction period is set for 36 months, followed by a 12-month warranty period [1] - The contract's execution will not significantly impact the company's total assets, net assets, or net profit for the current year [1] Group 2 - The long-term nature of the contract is anticipated to contribute positively to the company's operating income and total profit in the coming years [1]
创多项行业纪录 西气东输果子沟管道工程首条隧道今日贯通
Yang Shi Xin Wen· 2025-08-26 23:26
Core Points - The first mountain tunnel of the Guozi Valley pipeline, part of the West-East Gas Pipeline project, has been completed, marking a significant achievement in the construction capabilities of long-distance pipelines under complex geological conditions [1][2] - The Guozi Valley is a critical route for the West-East Gas Pipeline's second and third lines, which traverse the Tianshan Mountains, facing challenges from geological hazards [1] - The Guozi Valley pipeline project is expected to be fully operational by September 2027, having already transported over 557 billion cubic meters of natural gas, benefiting 500 million people along the pipeline [1] Industry Achievements - The Guozi Valley pipeline project features a total length of 32 kilometers, with four long-distance mountain tunnels comprising 23.16 kilometers, showcasing multiple industry records [2] - The tunnels have the longest single excavation length (6,612 meters), the largest cross-section (6,870 mm), the highest elevation (2,005 meters), the greatest height difference (324 meters), and the steepest slope (10.61%) in the domestic oil and gas pipeline sector [2] - This project is the first in the industry to cross an active seismic fault zone, utilizing the largest diameter and longest construction distance dual-shield full-face hard rock tunnel boring machine, ensuring an average safe excavation rate of 450 meters per month [2]
“四全”管道焊接检测机器人破解油气施工难题
Ke Ji Ri Bao· 2025-04-14 01:15
Core Viewpoint - The "Four Comprehensive" pipeline welding detection robot technology system, developed independently by China, marks a significant advancement in the construction of long-distance pipelines, overcoming technical bottlenecks in automatic welding [1][2]. Group 1: Technology Breakthroughs - The "Four Comprehensive" system achieves breakthroughs in four key areas: full diameter coverage from 33mm to 1422mm, adaptability to various terrains including slopes up to 30 degrees, capability for automatic welding of all joint types, and zero-gap assembly for automatic welding and AUT detection [2]. - The system has been successfully applied in major projects such as the China-Russia East Line and the West-to-East Gas Pipeline, with a total of 65 sets of equipment formed [2]. Group 2: Operational Efficiency - The new system has doubled the daily work efficiency of a single machine and improved the first-time pass rate by 11% [1]. - The company is focusing on further advancements in unmanned welding technology, including one-click start/stop for automatic welding machines, real-time data collection and transmission, and AI evaluation algorithms [2]. Group 3: Industry Impact - The successful development of the "Four Comprehensive" system represents a paradigm shift in global oil and gas pipeline construction, transitioning from "engineering catch-up" to "technological leadership" [2].