Workflow
Bridge Construction
icon
Search documents
杭州湾跨海铁路桥首座主塔封顶
Xin Lang Cai Jing· 2026-01-17 00:13
Core Insights - The completion of the 8th main tower of the Hangzhou Bay Cross-Sea Railway Bridge marks a significant milestone in the construction of the Tongsu-Jiaoyou High-Speed Railway, which is the world's longest cross-sea railway bridge currently under construction [1][2] Group 1: Project Overview - The Hangzhou Bay Cross-Sea Railway Bridge spans 29.2 kilometers and consists of three navigation bridges and 26 kilometers of approach bridges, designed for a speed of 350 km/h with a double-track, ballastless railway [1][2] - The 8th main tower, located on the North Navigation Bridge, features a steel box-steel truss combination cable-stayed bridge structure, with a total length of 932.7 meters and a main span of 450 meters, setting a record for the largest span ballastless track cable-stayed bridge under construction [2] Group 2: Engineering Innovations - The project employs an innovative intelligent hydraulic climbing formwork system that allows for automatic synchronous lifting and real-time monitoring of stress and displacement, enhancing safety and efficiency in the construction of the 200-meter high tower [1][2] - To ensure a solid foundation in deep sea conditions, 52 drilled piles with a diameter of 2.5 meters and a depth of up to 150 meters were installed, providing robust support for the main tower [2][3] Group 3: Construction Progress - The overall construction progress of the bridge has reached 75%, with plans to achieve structural continuity within the year [3] - Future construction activities will focus on the prefabrication of concrete box girders and the erection of steel beams to facilitate the early completion of the Tongsu-Jiaoyou High-Speed Railway [3]
“天空之桥”展雄姿
Xin Lang Cai Jing· 2026-01-15 17:23
Core Viewpoint - The completion of the main tower 4 of the Chizhou Yangtze River Bridge marks a significant milestone in the project's construction, indicating progress towards its completion [1] Group 1: Project Details - The main tower 4 of the bridge stands at a height of 272.7 meters, equivalent to 83 stories [1] - The design features pure white towers and steel beams, giving it an aesthetic appeal likened to a "sky bridge" [1] - This is the first of the two main towers to be completed, allowing the project to transition to the next phase, which includes the installation of stay cables [1] Group 2: Significance - Once completed, the bridge will become the sixth rail-road bridge crossing the Yangtze River in Anhui province [1]