±800千伏特高压直流输电项目
icon
Search documents
南方电网专家会议要点-Southern Power Grid Expert Call Takeaways
2025-11-12 11:15
Summary of Southern Power Grid Expert Call Takeaways Industry Overview - **Industry**: Power Equipment Sector in China - **Company**: Southern Power Grid Key Insights 1. **Rising Capital Expenditures (Capex)**: - Southern Power Grid's capex is projected to increase from Rmb120–130 billion (2021–2024) to Rmb172 billion in 2024, with expectations of Rmb175 billion in 2025 and Rmb178 billion in 2026. [2][2][2] - State Grid's capex is also expected to rise, reaching Rmb520–550 billion in 2025 from Rmb500 billion in 2024. [2][2][2] 2. **Investment Allocation**: - 80% of total grid capex is allocated to transmission and distribution networks. [3][3][3] - In 2025, Southern Power Grid plans to allocate Rmb120 billion for transmission and distribution, with Rmb57 billion for transmission and Rmb64 billion for distribution. [3][3][3] 3. **Transmission Projects**: - The ±800-kilovolt UHV DC transmission project from Xizang to the Guangdong-Hong Kong-Macao Greater Bay Area is expected to accelerate investment growth by 15-20% year over year in 2025. [4][4][4] - Planned transmission capacity is anticipated to double to around 110-120 GW by the end of the 15th FYP (2026-2030). [4][4][4] 4. **Distribution Network Investments**: - Investment completion rates for distribution networks are historically lower than for transmission networks. [5][5][5] - From 2025, distribution network investments are expected to exceed those in transmission networks, with a projected Rmb64 billion for distribution in 2025. [5][5][5] 5. **Digital Transformation**: - The penetration rate of digitalized distribution networks is projected to rise from 7% to 100% by the end of the 15th FYP, potentially increasing investment in this area tenfold. [8][8][8] - Capex in digitalization has increased from 1% to 5%-7% of total grid capex, with a focus on applications and digital transformation. [9][9][9] 6. **Technological Transformation**: - Southern Power Grid plans to spend Rmb18.2 billion on technological transformation in 2025, increasing to Rmb20 billion in 2026. [10][10][10] - Major spending will focus on production technology transformation, with Rmb12 billion planned for 2025. [11][11][11] 7. **Research and Development (R&D)**: - R&D capex is expected to grow from Rmb500 million at the beginning of the 14th FYP to Rmb4 billion in 2025, representing 1.5% of revenue. [12][12][12] 8. **Energy Storage Systems (ESS)**: - Southern Power Grid plans to grow pumped storage capacities from 10 GW to 30 GW during the 15th FYP. [13][13][13] - Demand for new types of ESS, particularly BESS, is accelerating, with significant growth expected in both power supply and grid-side installations. [14][15][15] 9. **Virtual Power Plants (VPP)**: - VPP development is shifting from local projects to national strategies, with a target load adjustment capacity of 5% of maximum load by the end of the 15th FYP. [17][17][17] - Investment in VPPs is expected to diversify revenue models beyond subsidies, focusing on electricity trading and ancillary services. [17][17][17] Additional Considerations - **Strategic Shift**: There is a strategic pivot in capital allocation towards grid digitalization and modernization, particularly in distribution networks, driven by national policy mandates. [18][18][18] - **Investment Opportunities**: Related stocks include Nari Tech, Southern Power Grid Tech, and Dongfang Electronics, among others. [18][18][18] - **Risks**: Potential risks include slower-than-expected growth in grid investment and technological development. [19][19][19]