Workflow
∞Power 6.25MWh 4h储能系统
icon
Search documents
1.5GWh!海辰储能再签重要订单
行家说储能· 2025-11-07 10:36
Core Viewpoint - Xiamen Haicheng Energy Storage Technology Co., Ltd. has signed a strategic cooperation agreement with El-Mor Renewable Energy, one of Israel's largest EPC contractors, to deploy a long-duration energy storage system project totaling 1.5GWh in Israel [1][2]. Group 1: Project Details - The collaboration involves the use of Haicheng's self-developed ∞Power 6.25MWh 4h energy storage system, with El-Mor responsible for designing and constructing the energy storage systems and related infrastructure [2][3]. - The total scale of the project is 300MW/1.5GWh, including a landmark facility in RAMAT BEKA, which will be the largest photovoltaic + battery storage system project in the region [3]. Group 2: Market Position and Orders - This project marks Haicheng's first significant overseas deployment of its long-duration energy storage solutions, with the company having secured multiple orders, totaling over 25GWh in Europe by the second half of 2025, of which 70% are long-duration storage projects [6]. - As of 2025, Haicheng's cumulative total order scale exceeds 44.5GWh [7]. Group 3: Industry Context - The energy storage industry is at a critical technological iteration point, with long-duration storage becoming essential for grid stability as renewable energy generation increases [7]. - It is widely recognized that when renewable energy generation exceeds 20%, long-duration storage of over 4 hours becomes a necessity, and when it reaches 50%-80%, storage duration needs to extend beyond 10 hours [7]. Group 4: Technological Advancements - Haicheng has proactively positioned itself in the long-duration lithium battery storage sector since 2022, launching the world's first long-duration storage-specific battery with a capacity of 1175Ah [7]. - The company has developed core technologies for long-duration storage, covering the entire supply chain from materials to battery cells and systems, becoming the first globally to achieve mass production of large cells for long-duration lithium battery storage [7]. Group 5: Manufacturing Capacity - Haicheng has invested over 13 billion yuan to establish the world's first zero-carbon long-duration energy storage industrial park in Heze, Shandong, with an annual production capacity of 30GWh for energy storage batteries and 20GWh for energy storage systems [8]. - The facility will utilize Haicheng's fifth-generation intelligent production line, with a single line capacity exceeding 10GWh, providing strong support for the development of long-duration energy storage [8].
海辰储能达成1.5GWh储能合作!
起点锂电· 2025-11-07 09:14
倒计时1天 此次合作中,El-Mor将为多个项目设计并建造储能系统及相关基础设施,总规模达300MW /1.5GWh。其中包括多个标志性设施,如位于 RAMAT BEKA的1GWh光伏+电池储能系统项目是该地区规模最大的同类工程项目,将为区域电网灵活性树立新标杆。 海辰储能将提供自主研发的∞Power 6.25MWh 4h储能系统,该系统是其交直流一站式解决方案"能源设备套件(EEP)"的一部分。该EPP 将电池集装箱、PCS、中压变压器、中压开关设备及能源管理系统(PPC)整合至统一平台,并涵盖能源功率选型、并网建模、保护协调及 消防等维度。该项目是海辰储能长时储能方案在海外部署的首个重大标志性工程。 海辰储能以色列高级销售总监Steven Song表示:"以色列乃至整个中东地区正处于能源转型的关键节点。此次与El-Mor达成战略合作,我 们将提供长时储能解决方案,为以色列新能源并网与电网稳定运行提供有力支撑,共同打造更清洁、可持续的未来电力系统。 El-Mor董事长Avi Elkayam表示:"我们很荣幸能与海辰储能携手推进以色列向可持续且具有韧性的能源系统转型。海辰储能的∞Power 6.25MWh解决 ...
6.25MWh储能系统迎来落地关口
行家说储能· 2025-10-14 10:54
Core Viewpoint - The article highlights the rapid deployment and delivery of large-scale energy storage systems, particularly the 6.25MWh 4h energy storage system developed by Hai Chen Energy, marking a significant milestone in the European market [2][6]. Group 1: Product Launch and Delivery - Hai Chen Energy has shipped its first batch of 12 units of the world's first 6.25MWh 4h energy storage system to Europe, with delivery expected to reach Germany in approximately 28 days [3][6]. - The 6.25MWh storage system is designed for high energy efficiency, safety, rapid deployment, and intelligent operation, making it suitable for renewable energy integration and power system frequency regulation [5][6]. Group 2: Industry Trends - The industry is witnessing a surge in the production and delivery of 6MWh+ energy storage systems, with several companies, including Kelu Electronics and Cai Ri Energy, announcing their own large-capacity systems [8][9]. - Kelu Electronics has launched a new generation Aqua C3.0 storage system with a capacity of 6.25MWh, expected to achieve large-scale delivery capabilities by the end of 2025 [8]. - Cai Ri Energy has announced its capability for mass production and delivery of a 6.25MWh containerized storage system based on a 587Ah battery cell, with project deliveries expected to begin in Q4 2025 [8]. Group 3: Strategic Partnerships and Orders - Hai Chen Energy has secured substantial orders in Europe, including a 2GWh supply agreement with Solarpro and a 3GWh project collaboration with BOS Power [10]. - The company has previously announced significant orders totaling 5GWh in Europe, indicating strong demand for its energy storage solutions [6][10].
累计出货量突破100GWh,海辰储能迎来新里程碑
Jiang Nan Shi Bao· 2025-08-25 10:32
Core Insights - The company celebrated a significant milestone of achieving a cumulative shipment of 100GWh in energy storage products, marking its rise in global industry rankings from fifth in 2023 to second in the first half of 2025 [1][2]. Group 1: Strategic Focus and Innovation - The breakthrough of 100GWh is attributed to the company's differentiated strategy focused solely on energy storage, allowing it to concentrate resources on meeting storage demand and leading the industry with innovative products [2]. - The company has consistently introduced advanced technology products, including the world's first long-duration energy storage battery and system in 2023, and a high-capacity sodium-ion battery in 2024, demonstrating its commitment to product innovation and market leadership [2][3]. Group 2: Manufacturing Excellence - The company employs advanced manufacturing techniques, including predictive modeling and micron-level precision control, achieving a defect rate at the parts-per-billion (PPB) level, ensuring high-quality production [4]. - The integration of Gen AI and IoT technologies has enabled the company to optimize efficiency and traceability throughout the manufacturing process [4]. Group 3: Customer-Centric Services - The company has established a comprehensive operational system that spans the entire project lifecycle, ensuring high-quality delivery and service for energy storage projects [5]. - With a global service network covering over 20 countries, the company offers customized service packages and has achieved a 100% on-time delivery rate for project commissioning [5]. Group 4: Safety and Reliability - The company emphasizes safety in its operations, implementing rigorous safety controls across the entire supply chain, from production to recycling, ensuring stable performance in extreme conditions [6][7]. - The successful completion of the world's first open-door combustion test for its energy storage system under extreme conditions further validates the reliability of its products [7]. Group 5: Future Growth and Market Position - The company views the 100GWh shipment milestone as a new starting point, with plans to leverage its focus on long-duration energy storage to drive future growth in the global market [8]. - The establishment of a smart manufacturing base in Chongqing is expected to enhance production capabilities and support the company's strategic goals in the long-duration energy storage sector [8].