Workflow
三峡能源山西和顺100MW光伏项目工程设计施工总承包服务
icon
Search documents
三峡能源山西和顺100MW光伏项目工程设计施工总承包招标
Jin Rong Jie· 2025-07-23 06:43
Core Viewpoint - The article discusses the announcement of a tender for the design and construction of the 100MW photovoltaic project by Three Gorges New Energy Power Generation (Heshun) Co., Ltd. in Shanxi Province, China [1][3]. Group 1: Project Details - The project site is located approximately 30 km northwest of Heshun County, Jinzhong City, Shanxi Province, covering an area of about 3,500 acres [1]. - The planned installed capacity of the project is 100MW, utilizing 590Wp modules, and will connect to the 220kV Langsheng photovoltaic power station through a 35kV overhead collection line [1]. - The construction scope includes the photovoltaic area, 35kV overhead collection line, and the expansion of the 220kV Langsheng photovoltaic power station [1]. Group 2: Construction and Services - The tender includes comprehensive services such as surveying, design, procurement, installation of all equipment and materials (excluding photovoltaic modules, inverters, and fixed supports), and various engineering works [2]. - The project is scheduled to commence on September 10, 2025, with a target for full capacity grid connection by December 31, 2025 [2].