乌蒙山大桥

Search documents
乌蒙山大桥进行静态荷载试验
Ren Min Wang· 2025-05-17 15:00
Core Points - The static load test for the Wumeng Mountain Bridge was conducted on May 17, marking a significant step towards its completion [3][7][11] - The bridge is a key control project for the Naying to Qinglong Expressway, featuring a main span of 270 meters and a designed speed of 100 kilometers per hour [5][11] Group 1 - The static load test involved 12 large trucks loaded with sand and gravel, which were positioned for symmetrical and eccentric testing to assess the bridge's structural performance and actual load-bearing capacity [3][7][11] - The test results will provide a scientific basis for the bridge's completion acceptance [3][7][11]