井工煤矿智能采煤系统

Search documents
云鼎科技:公司子公司北斗天地在井工煤矿智能掘进系统等方面均有自主知识产权产品
Zheng Quan Ri Bao Wang· 2025-08-11 08:13
证券日报网讯 云鼎科技(000409)8月11日在互动平台回答投资者提问时表示,公司子公司北斗天地在 井工煤矿智能掘进系统、井工煤矿智能采煤系统、辅助及其他智能系统等方面均有自主知识产权的产 品,如GIS系统、数字孪生辅助控制系统、采掘智能化产品、辅助运输系统等。公司子公司德通电气在 智能洗选领域主要产品和业务包括煤炭洗选自动化系统集成、选煤厂智能化解决方案、智能在线灰分检 测系统和工矿智能化配套设备。公司相关业务情况详见公司披露的《2024年年度报告》第三节"管理层 讨论与分析"章节。 ...
国家能源局综合司关于开展煤矿智能化技术升级应用试点工作的通知
国家能源局· 2025-07-31 08:41
Core Viewpoint - The article emphasizes the importance of advancing the intelligent transformation of coal mines through the implementation of pilot projects focused on key technological upgrades and applications in the coal mining industry [2][3]. Group 1: Overall Requirements - The initiative aims to enhance the operational level of coal mine intelligence by leveraging industry research capabilities and focusing on key areas and typical application scenarios [3]. - The goal is to establish projects with high levels of intelligent control and autonomous stable operation capabilities, leading to improved productivity in the coal mining sector [3]. Group 2: Pilot Tasks - The pilot projects will target five key areas: 1. Intelligent tunneling systems for underground coal mines, focusing on high-precision geological detection and integrated tunneling technologies [4]. 2. Intelligent coal mining systems, emphasizing adaptive cutting and intelligent decision-making technologies [4]. 3. Intelligent stripping systems for open-pit coal mines, enhancing process coordination and remote control capabilities [5]. 4. Intelligent coal selection systems, improving detection and analysis technologies for efficient coal sorting [5]. 5. Auxiliary and other intelligent systems, integrating AI and enhancing operational efficiency in various mining processes [5]. Group 3: Organization and Implementation - Coal mining provinces and relevant central enterprises are tasked with evaluating their current intelligent construction status and selecting suitable pilot directions for project applications [7]. - A rigorous selection process will be conducted, with a limit on the number of recommended projects to ensure quality [7]. - The National Energy Administration will oversee the evaluation and approval of pilot projects, ensuring they meet the necessary criteria for intelligent construction [8]. Group 4: Work Requirements - Projects must align with pilot directions and demonstrate significant leading effects, with a preference for new projects and upgrades to existing intelligent systems [9]. - The deadline for submitting project recommendations is set for September 15, 2025, with a maximum construction period of three years [9]. - Continuous monitoring and support from local coal industry management departments are encouraged to ensure effective implementation of pilot projects [9][10].
国家能源局:拟组织开展煤矿智能化技术升级应用试点工作
news flash· 2025-07-31 07:16
国家能源局综合司发布关于开展煤矿智能化技术升级应用试点工作的通知,聚焦煤矿智能化建设重点领 域和典型应用场景,升级开展关键技术攻关和创新实践应用,推动建成一批装备智能控制水平高、生产 系统自主稳定运行能力强的典型项目,凝练出可复制、可推广的煤矿智能化建设方案和运行模式,引领 带动煤矿智能化向更高水平发展,提升行业生产力水平。重点包括以下5个方面:井工煤矿智能掘进系 统、井工煤矿智能采煤系统、露天煤矿智能采剥系统、智能选煤系统、辅助及其他智能系统。 ...