光储充超充站
Search documents
海南儋州白马井“光储充”超充站正式投产!
Zhong Guo Dian Li Bao· 2026-02-02 02:39
Core Insights - The newly launched "light-storage-charging" supercharging station in Hainan's Danzhou Baima Jing has a total installed capacity of 8,000 kW, making it the largest new energy heavy truck charging station in Hainan Province [1] - The station enhances the reliability and efficiency of the new energy heavy truck refueling network in Hainan, supporting the island's green logistics infrastructure [1] Group 1 - The supercharging station was jointly invested by Southern Power Grid Hainan Electric Vehicle Company and Hainan Sushutong Supply Chain Co., Ltd., with a total investment of 12 million yuan, and was completed in two months [1] - It features 40 high-power charging terminals, capable of simultaneously charging 20 heavy trucks, with a daily service capacity exceeding 200 vehicle charging sessions [1] - The station employs integrated "light-storage-charging" technology, combining photovoltaic power generation, intelligent energy storage, and high-power charging technology, expected to reduce carbon dioxide emissions by approximately 200,000 kg annually [1] Group 2 - Future expansion plans for the station include an additional investment of about 17 million yuan, aiming to establish a diversified comprehensive demonstration station with supercharging, battery swapping, and light-storage integration [2] - Upon completion, the station's total installed capacity is projected to reach 12,000 kW, with an annual charging capacity of approximately 35.76 million kWh, more than three times the current capacity, and expected annual carbon dioxide reduction exceeding 500,000 kg [2] - Hainan's electric heavy truck electrification rate has rapidly increased to 36.1%, with 13 heavy truck charging and swapping stations built across the province, totaling an installed capacity of about 35,000 kW [2]
海南儋州白马井"光储充"超充站正式投产!
Zhong Guo Dian Li Bao· 2026-01-29 08:19
Group 1 - The "光储充" supercharging station in Hainan Danzhou officially commenced operations on January 28, with a total installed capacity of 8000 kW, making it the largest new energy heavy truck charging station in Hainan Province [1] - The station was jointly invested by Southern Power Grid Hainan Electric Vehicle Company and Hainan Sushutong Supply Chain Co., Ltd., with a total investment of 12 million yuan, and it took two months to complete [3] - The station features 40 high-power charging terminals, capable of servicing over 200 vehicle charging sessions daily, and is designed to meet the fast charging needs of various new energy vehicles [3] Group 2 - The station employs integrated "光储充" technology, combining photovoltaic power generation, intelligent energy storage, and high-power supercharging technology, which is expected to reduce carbon dioxide emissions by approximately 200,000 kg annually [3] - Future expansion plans include an additional investment of about 17 million yuan to increase the total installed capacity to 12,000 kW, with an expected annual charging capacity of approximately 35.76 million kWh, more than three times the current capacity [3] - The electrification rate of heavy trucks in Hainan has rapidly increased to 36.1%, with 13 heavy truck charging and swapping stations built across the province, totaling an installed capacity of about 35,000 kW [5] Group 3 - The heavy truck charging and swapping volume is projected to reach 2,302.94 million kWh in 2025, representing a year-on-year increase of over 10 times [6] - The company aims to support the construction of a comprehensive charging network, including county-level supercharging stations and a rapid charging network for towns, to enhance the clean, low-carbon, and efficient green energy system in Hainan [6]