Workflow
分片式塔筒
icon
Search documents
乘风而起 聚链成势 新疆塔城风能产业集群崛起
Yang Guang Wang· 2025-05-26 02:03
Core Viewpoint - The Xinjiang Tacheng region is leveraging its wind energy resources and the establishment of a key development and opening-up pilot zone to create a complete industrial chain for wind power, contributing to the "dual carbon" goals and the Belt and Road Initiative. Industry Development - The SANY (Tacheng) Wind Power Equipment Co., Ltd. has become a production base for wind turbine blades, with an annual output of 600 blades, and has exported 18 sets to Kazakhstan since its production began in 2022 [2] - The company has upgraded its blade production from 84 meters to 112 meters, with plans to produce 131-meter blades next [3] - The Zhongshui Fourth Bureau (Tacheng) Energy Equipment Co., Ltd. has a production line for tower sections, with an annual capacity of 400 sets, and has already secured over 100 orders this year [3] - The Jinwind Wind Power Equipment Co., Ltd. in Tacheng has received orders worth 4.5 million, aiming to expand its business into Central Asia [3] Renewable Energy Utilization - The region has a planned wind and solar capacity of 21.8 million kilowatts, with 16.6 million kilowatts designated for wind power [5] - The average wind speed in the area is 6.04 m/s, which supports the development of wind energy projects [5] - The establishment of a green computing power industrial park is expected to generate over 2 billion yuan in annual output and create around 500 jobs [5][6] Infrastructure Development - The Tacheng region is constructing the Tazhong 750 kV transmission and transformation project to enhance the power supply capacity, with a planned completion date in August 2026 [9][12] - This project will significantly improve the power supply capability and stability of the regional grid, supporting the development of a comprehensive energy base in Tacheng [12]