区域医院
Search documents
毛里塔尼亚总统加兹瓦尼出席多项发展项目启用及奠基仪式
Shang Wu Bu Wang Zhan· 2025-12-03 16:38
Core Insights - Mauritania's President Ghazouani inaugurated two energy projects and laid the foundation for several infrastructure projects aimed at enhancing local energy supply and improving living conditions [1] Group 1: Energy Projects - The inaugurated projects include a 12 MW solar power plant and a 30 MW fuel thermal power station, funded by the National Industrial and Mining Company (SNIM) with total investments of $10.75 million and €56.45 million respectively [1] - The operationalization of these power plants is expected to increase SNIM's production electricity capacity and meet the growing social and economic energy demands in the region, raising the share of clean energy to 29% [1] Group 2: Water Supply and Healthcare Infrastructure - The foundation was laid for the second phase expansion of the Oued El Qah seawater desalination plant, which will add a capacity of 1,000 cubic meters per hour, with a total investment of 45 million new ouguiyas, fully funded by the SNIM Foundation [1] - Additionally, the construction of a regional hospital in Zouérat was initiated, designed to meet H1 international standards with 80 beds and a total investment of 288.4 million new ouguiyas, expected to significantly enhance local healthcare services [1]