Workflow
危化品中试项目
icon
Search documents
又一地规范危化品中试项目安全管理
Zhong Guo Hua Gong Bao· 2025-06-27 11:29
Core Points - The Jiangxi Provincial Emergency Management Department has issued the "Safety Management Measures for Pilot Projects of Hazardous Chemical (Chemical) Production Enterprises (Trial)" to detail the construction and safety management of pilot projects in hazardous chemical production [1][2] - The measures emphasize that pilot projects must be constructed within the production area of hazardous chemical enterprises and must adhere to strict safety protocols [1][2] Group 1: Construction Requirements - Pilot projects are defined as complete process devices for chemical pilot testing, including necessary facilities such as buildings, process operation units, and safety systems [1] - Pilot devices must be independently located in fire prevention zones, and while they can share control rooms with existing production devices, their automatic control systems must be independently set up [1] Group 2: Safety Management - The measures prohibit the use of certain hazardous chemicals and outdated safety production technologies in pilot projects [1] - High-risk processes such as chlorination and fluorination must undergo comprehensive safety risk assessments before proceeding with design and safety facility planning [1][2] Group 3: Supervision Management - Pilot projects are limited to industrial tests of new products, processes, and technologies, with a strict prohibition on large-scale production using pilot devices [2] - The operational period for a single pilot project should not exceed two years, with a possible one-year extension subject to approval from local emergency management departments [2]