Workflow
园区物流煤储运系统项目
icon
Search documents
屡罚屡犯!宝丰能源为何执着于未批先建
Qi Lu Wan Bao· 2025-08-07 23:50
Core Points - Ningxia Baofeng Energy Group Co., Ltd. has been penalized for unauthorized construction of driver rest buildings without obtaining the necessary construction planning permit, violating Article 40, Paragraph 1 of the Urban and Rural Planning Law of the People's Republic of China [1][2] - The company is required to complete the necessary procedures within 30 days from the effective date of the administrative penalty decision and has been fined 6% of the construction cost, amounting to approximately RMB 839,323.58 [1][2] - This is not the first time Baofeng Energy has faced penalties for similar violations, with previous infractions recorded in June 2025 and earlier [2][4] Summary of Violations - The unauthorized construction involved the driver rest buildings (3456) at the Baofeng Energy B District Logistics Transportation System project in the Ningdong Energy and Chemical Base [1][2] - The company has a history of violations, including unauthorized construction of a logistics coal storage and transportation system project in November 2022 [2][4] - The total area of illegally occupied land in previous infractions includes 12,414 square meters (18.62 acres) and 2,156 square meters (3.23 acres), with fines imposed for each instance [3][5] Financial Penalties - The total fine for the recent violation is RMB 839,323.58, calculated as 6% of the construction cost of RMB 13,988,726.25 [1][2] - Previous penalties include a total of RMB 1,978,200 for illegal land occupation and construction activities [3][4] - The company has faced fines for various infractions over the years, indicating a pattern of non-compliance with construction and land management laws [4][5]