煤基新材料
Search documents
习近平总书记关切事丨蹚出一条转型发展的新路子
Xin Hua She· 2025-09-11 16:56
Group 1: Energy Transition - The transformation of resource-based regions is a significant issue for economic development, with a focus on energy transition, industrial upgrading, and moderate diversification [2] - The "Photovoltaic Great Wall" in the Kubuqi Desert is a vivid example of integrating energy transition with ecological governance, featuring solar panels that convert sunlight into clean energy [3][5] - Ordos, a traditional coal city, is actively pursuing a green and low-carbon energy structure under the "dual carbon" strategy, emphasizing the importance of upgrading traditional energy industries [4][7] Group 2: Industrial Upgrading - The China Pingmei Shenma Group in Pingdingshan is transforming its coal-based industry into a new materials industry, showcasing the potential of coal as a source for various products [8][9] - The merger of Pingmei Group and Shenma Group has created a unique coal-based nylon chemical industry chain, enhancing the region's industrial capabilities [11] - The group's revenue reached nearly 100 billion yuan last year, with over 200 enterprises in the "China Nylon City," reflecting significant industrial growth [12] Group 3: Moderate Diversification - The Shanxi Transformation Comprehensive Reform Demonstration Zone is fostering new industries, including third-generation semiconductors and new materials, to optimize the business environment and stimulate economic vitality [13][14] - The rapid development of Shanxi ShuoKe Crystal Co., Ltd. in the semiconductor sector exemplifies the successful cultivation of emerging industries in the region [16][17] - The demonstration zone has launched over 100 strategic emerging industry projects in the past three years, indicating a strong commitment to diversified economic development [17][18]
屡罚屡犯!宝丰能源为何执着于未批先建
Qi Lu Wan Bao· 2025-08-07 23:50
Core Points - Ningxia Baofeng Energy Group Co., Ltd. has been penalized for unauthorized construction of driver rest buildings without obtaining the necessary construction planning permit, violating Article 40, Paragraph 1 of the Urban and Rural Planning Law of the People's Republic of China [1][2] - The company is required to complete the necessary procedures within 30 days from the effective date of the administrative penalty decision and has been fined 6% of the construction cost, amounting to approximately RMB 839,323.58 [1][2] - This is not the first time Baofeng Energy has faced penalties for similar violations, with previous infractions recorded in June 2025 and earlier [2][4] Summary of Violations - The unauthorized construction involved the driver rest buildings (3456) at the Baofeng Energy B District Logistics Transportation System project in the Ningdong Energy and Chemical Base [1][2] - The company has a history of violations, including unauthorized construction of a logistics coal storage and transportation system project in November 2022 [2][4] - The total area of illegally occupied land in previous infractions includes 12,414 square meters (18.62 acres) and 2,156 square meters (3.23 acres), with fines imposed for each instance [3][5] Financial Penalties - The total fine for the recent violation is RMB 839,323.58, calculated as 6% of the construction cost of RMB 13,988,726.25 [1][2] - Previous penalties include a total of RMB 1,978,200 for illegal land occupation and construction activities [3][4] - The company has faced fines for various infractions over the years, indicating a pattern of non-compliance with construction and land management laws [4][5]