国际热核聚变实验堆ITER校正场线圈采购包
Search documents
我国交付国际热核聚变实验堆ITER校正场线圈采购包任务
Xin Hua Wang· 2025-12-28 07:12
Group 1 - The core achievement is the successful completion of the manufacturing tasks for the ITER correction field coils, with the last four coils delivered in Hefei, Anhui [1] - The ITER correction field coils consist of three groups of 18 coils, which are crucial components of the main magnetic system of the ITER device, directly affecting plasma operation parameters [1] - The procurement package for the correction field coils was entirely developed and manufactured independently by China, taking 15 years from preliminary research in 2010 to completion in 2023, showcasing advancements in superconducting magnet engineering [2] Group 2 - The manufacturing of the ITER correction field coils involved strict requirements for size, welding, deformation control, and testing environments, highlighting the technical challenges faced [2] - The Institute of Plasma Physics at the Hefei Institute of Physical Science, part of the Chinese Academy of Sciences, plays a significant role in the ITER project, handling various procurement packages and contracts, which constitute a large portion of China's responsibilities in the ITER project [2]