Workflow
地铁11号线
icon
Search documents
地铁11号线,让葛店深度融入武汉
Chang Jiang Ri Bao· 2026-01-09 00:39
从汉阳的家里出发,过个天桥,就来到紫阳湖站,坐上武汉地铁11号线便可直达葛店南站。"全程只要54分钟,花费仅7.3元。"柳骏 说,他在武汉和鄂州葛店之间通勤了14年,见证了两地越来越便捷的交通联系。 "地铁11号线非常方便武鄂双城生活的人,葛店南站早晚高峰,均是在两地通勤的'打工人'。"柳骏说,2025年2月份退休后,他仍每周 两三次到位于葛店的鄂州医药行业协会上班。 武汉地铁11号线列车(资料图) 柳骏是鄂州医药行业协会秘书长,退休前一直担任武汉爱民制药总工程师。2009年,武汉爱民制药为了获得更大的生产空间,搬到了 鄂州葛店经开区药谷。柳骏2011年到该公司上班,开始了跨城生活。 柳骏回忆,刚开始他要先坐武汉地铁4号线转2号线,然后乘坐企业班车到公司,需要2小时。 2021年,武汉地铁11号线葛店段开通运营,将地铁从光谷左岭延伸到鄂州葛店。葛店坐地铁到左岭仅需4分钟,到光谷中心城仅需20 分钟,到武汉东站仅需30分钟,换乘地铁2号线可通达武汉全城。柳骏的路线变成4号线转2号线再转11号线,一趟仍需两个多小时。 2024年12月27日,地铁11号线新线开通运营,从江安路站到葛店南站全线长度约39.8公里,列 ...
江北商务区站搭建4道门洞 地铁11号线盾构机将进入地下空间
Nan Jing Ri Bao· 2025-08-25 02:33
Group 1 - The construction of the underground space for the subway lines is progressing, with the completion of two tunnel openings for Line 4 and the initiation of the shield tunnel openings for Line 11 [1] - The core structure of the underground space has been completed, and the installation of half-ring steel structures is underway, which will support the future subway operations [1] - The construction site is equipped with air circulation systems and water mist to improve working conditions for the laborers [1] Group 2 - The completed steel ring openings for Line 4 are designed to facilitate cross traffic with Line 11, making the business district station a transfer hub [2] - The underground space is being constructed in phases, with significant progress on the surrounding buildings, including the completion of eight towers forming the Jiangyin skyline [2] - The Yangtze River Financial Center is a key project in Jiangsu's financial cluster, focusing on new financial services, with over 90% of the curtain wall installation completed and expected to finish by the end of September [2]
武咸城际铁路即将公交化运营配套
Chang Jiang Ri Bao· 2025-05-28 01:28
Core Viewpoint - The Hubei Railway Group is initiating a public transport operation model for the Wuxian Intercity Railway, which is expected to enhance cooperation and integrated development between cities [1][2]. Group 1: Project Overview - The Wuxian Intercity Railway spans 90.12 kilometers, connecting Wuhan Wuchang Station to Xianning South Station, with a design speed of 250 km/h, and has been operational since December 28, 2013 [2]. - The railway will undergo a 60-day renovation starting in June to improve waiting areas, flow lines, and supporting facilities [1]. Group 2: Economic Impact - The public transport operation model is anticipated to facilitate personnel movement between Wuhan and Xianning, thereby promoting regional economic development [2]. - The implementation of intercity railway public transport is seen as a significant marker of urban integration, enhancing collaboration between cities [2]. Group 3: New City Express Line - The "New City Express Line" has introduced a monthly ticket system, allowing users to purchase tickets via a mini-program on Alipay or WeChat, with significant cost savings for frequent travelers [3]. - The line has become a crucial transportation link within the Wuhan metropolitan area, with over 200,000 passengers transported since its opening [3][4]. Group 4: Metro Line Developments - The opening of Metro Line 11 has significantly reduced travel time between Wuhan and Ezhou, enhancing the convenience for commuters [5][6]. - Since the opening of the Ezhou section of Metro Line 11 in 2021, it has transported over 16 million passengers, indicating its importance in facilitating urban mobility [6].