垃圾发电站
Search documents
870吨/日!中企承建南美最大固废转电能项目预计于2027年投入运营
Xin Hua She· 2025-11-10 00:54
Core Insights - The Barueri Waste-to-Energy Plant in Brazil is nearing completion, aiming to address local waste management issues while generating clean energy [1][2] - The project is a collaboration between China Electric Power Construction Group Shandong Electric Power Construction First Engineering Co., Ltd. and China Energy Engineering Group Northwest Electric Power Design Institute Co., Ltd. [1] - The plant is designed to process 870 tons of solid waste daily and has a capacity of 19.1 megawatts, expected to be operational by 2027 [1][2] Group 1 - The Barueri Waste-to-Energy Plant is one of the first in Brazil and Latin America, located approximately 30 kilometers from São Paulo, a major commercial hub [1] - The project utilizes advanced Chinese waste incineration technology, ensuring that emissions meet environmental standards through multi-stage purification processes [2] - The plant aims to provide a dual solution for environmental management and clean energy supply, addressing the increasing waste management pressures in Brazil [2] Group 2 - There is significant potential for cooperation between Brazil and China in the field of green energy, leveraging Brazil's abundant resources and China's experience in large-scale applications [3] - The project reflects a growing trend towards sustainable waste management solutions in Brazil, moving away from high-pollution methods like open burning [2][3]
通讯丨中企承建垃圾发电站助力巴西“变废为能”
Xin Hua Wang· 2025-11-04 03:29
Core Insights - The construction of the Barueri waste-to-energy plant in Brazil, a collaboration between Chinese companies, aims to address local waste management issues while providing clean energy [1][2]. Group 1: Project Overview - The Barueri waste-to-energy plant is one of the first in Brazil and Latin America, covering an area of approximately 37,000 square meters and is expected to be operational by 2027 [1]. - The plant is designed to process 870 tons of solid waste daily and has a power generation capacity of 19.1 megawatts [1][2]. Group 2: Technology and Environmental Impact - The plant utilizes advanced Chinese waste incineration technology, ensuring that emissions meet environmental standards through multiple purification processes [2]. - The project combines Chinese green technology with local needs, providing a dual solution for environmental management and clean energy supply [2]. Group 3: Future Prospects - There is potential for the waste-to-energy model to be expanded to other regions in Brazil, addressing the increasing pressure of waste management in urban areas [2]. - The collaboration between Brazil and China in green energy is seen as a significant area for future development, leveraging Brazil's rich green energy resources and China's experience in large-scale applications [3].