Workflow
复兴220千伏变电站
icon
Search documents
雄安新区首个“近零碳”变电站建成投运
Xin Lang Cai Jing· 2025-07-09 02:50
Group 1 - The Xiong'an New Area's 12th green construction demonstration project, the Fuxing 220 kV substation, has been put into operation, serving as an important hub for the 220 kV regional ring network [1] - The substation has a capacity of 360 MVA and will support power supply for the core area of the headquarters in the starting zone, ensuring reliable electricity for enterprises and universities relocating from Beijing [1] - The operation of the Fuxing substation enhances the strength of the main network structure in the starting area and provides a reliable power source for the upcoming 110 kV substations [1] Group 2 - The Fuxing 220 kV substation is designed with the concept of "Reviving the Chinese Dream, Realizing the Future City" and is the first near-zero carbon substation in Xiong'an New Area [1] - The construction involved integrating eight green construction technology solutions, including sponge city concepts and carbon footprint management, to achieve near-zero carbon emissions throughout its lifecycle [1] - The State Grid Xiong'an New Area Power Supply Company is actively involved in the construction process, ensuring high-level acceptance testing of major equipment and auxiliary projects [2] Group 3 - The company aims to accelerate the implementation of the supporting 10 kV outgoing line project for the Fuxing substation, ensuring the establishment of the first batch of double petal network structures by the end of the year [2] - This initiative will provide strong support for the reliable power supply needed for the high-quality development of Xiong'an and the electricity demands of production and daily life [2]
多项创新!雄安新区220千伏复兴变电站投运
Core Viewpoint - The Xiong'an New Area has officially launched the Fuxing 220 kV substation, which is the first "near-zero carbon" substation in China, aimed at supporting the area's high-quality development and reliable power supply for enterprises and universities in Beijing [1][2]. Group 1: Project Overview - The Fuxing 220 kV substation is located in the Xiong'an New Area's startup zone, with a total investment of 470 million yuan and a capacity of 360 MVA [1]. - The substation serves as a crucial link between the eastern 500 kV Xiong East Station and the western 500 kV Xiong'an Station, enhancing the power supply network in the area [1]. Group 2: Green Construction Features - The substation is recognized as a green construction demonstration project, incorporating eight green construction solutions, including sponge city design and carbon footprint management [2]. - It utilizes 15 low-carbon technologies, such as intelligent systems, water recycling systems, and zero-carbon monitoring systems, making it the first energy monitoring substation throughout its lifecycle [2]. Group 3: Technological Innovations - The project has achieved innovations in various areas, including the application of "Beidou+" technology, installation of special-shaped steel structures, and the use of domestic BIM three-dimensional design [2]. - A smart construction management platform has been developed, integrating technologies like AI violation capture, fire smoke detection, and remote monitoring, exploring the use of robots and remote control methods in construction [2].