Workflow
奇台射电望远镜
icon
Search documents
一批重大工程取得新进展 为经济社会高质量发展注入强劲动能
Yang Guang Wang· 2025-06-09 01:52
Group 1 - The successful installation of the central processing platform for the Kenli 10-2 oilfield project marks significant progress in major engineering projects, contributing to high-quality economic development in China [1] - The Kenli 10-2 oilfield is the largest lithologic oilfield discovered offshore in China, with the central processing platform expected to enter production within the year after the installation [1] - The project utilized advanced technologies such as digital twin technology for 3D modeling and AI algorithms for precise positioning during the installation process [1] Group 2 - The completion of the main construction of the 110-meter diameter fully movable radio telescope in Qitai, Xinjiang, sets a solid foundation for subsequent antenna structure installation [2] - The Qitai radio telescope project is the first major scientific infrastructure in Xinjiang, expected to be completed by 2028, and aims to be the world's largest and most precise hundred-meter-level fully movable radio telescope [2] - The successful tunneling of the Dongye Tunnel, over 4,000 meters long, is a key milestone for the Xiongxin High-speed Railway, which is part of China's "eight vertical and eight horizontal" high-speed rail network [2]
新疆奇台射电望远镜中心塔建设进入收尾阶段
news flash· 2025-04-30 08:10
Core Points - The construction of the 110-meter diameter fully movable radio telescope, known as the Qitai Radio Telescope Center Tower, is nearing completion, with the main structure expected to be topped off by late May [1] - The project is located in a valley basin in Qitai County, Xinjiang, and is anticipated to be completed and operational by 2028 [1]