Workflow
小浪底水利枢纽
icon
Search documents
“定海神针”守护黄河安澜
Zhong Guo Xin Wen Wang· 2025-09-23 06:59
Core Insights - The Xiaolangdi Water Control Project plays a crucial role in managing the Yellow River, controlling 92.3% of its watershed area and 91.2% of its runoff, while also managing nearly 100% of sediment transport [1] - The project has significantly improved the downstream riverbed's flow capacity from less than 1,800 cubic meters per second to 5,000 cubic meters per second, enhancing flood safety and ensuring environmental coordination with water management [1] - In 2023, the project accelerated its digital transformation by establishing a digital twin platform, enabling unified management of water, sediment, and electricity, which enhances operational efficiency and monitoring capabilities [2] Group 1 - The Xiaolangdi Water Control Project is a key engineering initiative for the governance and protection of the Yellow River, addressing sediment accumulation issues effectively [1] - The project has conducted 30 water and sediment regulation operations since 2002, leading to an average riverbed incision of 3.1 meters downstream [1] Group 2 - The digital twin platform and integrated monitoring system enhance real-time operational oversight and intelligent scheduling of the reservoir, providing robust technical support for the river's safe operation [2] - The ongoing technological advancements will further solidify the Xiaolangdi Water Control Project's role in ensuring the long-term stability and sustainable development of the Yellow River basin [2]
(何以中国·黄河安澜)“定海神针”守护黄河安澜
Zhong Guo Xin Wen Wang· 2025-09-23 02:53
Core Viewpoint - The Xiaolangdi Water Conservancy Project serves as a critical control project for the governance, development, and protection of the Yellow River, significantly impacting its flow and sediment management [1][3]. Group 1: Project Significance - The Xiaolangdi Water Conservancy Project controls 92.3% of the Yellow River's watershed area, 91.2% of its runoff, and nearly 100% of its sediment transport, highlighting its pivotal role in the river's management [1]. - The Yellow River, known for its high sediment content, has an annual sediment transport volume of 1.6 billion tons, necessitating effective management strategies to address sediment accumulation [1]. Group 2: Operational Achievements - Since 2002, the Xiaolangdi Water Conservancy Project has completed 30 sediment and water regulation operations, increasing the downstream riverbed's flow capacity from less than 1,800 cubic meters per second to 5,000 cubic meters per second [3]. - The average riverbed incision in the main channel downstream has reached 3.1 meters, ensuring flood safety and promoting a harmonious interaction between environmental and water conservancy engineering [3]. Group 3: Technological Advancements - The project has accelerated its digital transformation, establishing a digital twin platform in 2023, which integrates water, sediment, and electricity management for unified control [3][4]. - The use of advanced monitoring technologies, including radar, drones, and intelligent monitoring systems, enhances real-time oversight and intelligent scheduling of reservoir operations [4]. Group 4: Future Outlook - With ongoing technological advancements, the Xiaolangdi Water Conservancy Project is expected to continue its role as a "stabilizing force" for the long-term safety of the Yellow River and the sustainable development of the surrounding economy and society [4].
应对黄河上中游洪水 小浪底水利枢纽今年首次开启汛期泄洪运用
He Nan Ri Bao· 2025-07-30 23:30
Group 1 - The Xiaolangdi Water Control Project has initiated flood discharge operations for the first time this flood season, releasing water at a flow rate of 800 cubic meters per second to manage high-density sediment-laden floodwaters caused by heavy rainfall in the Yellow River's upper and middle reaches [1] - As of July 29, the water level at Xiaolangdi Reservoir reached 226 meters, with a corresponding flood control capacity of 8.7 billion cubic meters, providing strong support for subsequent flood control and sediment reduction efforts [1] - The management center is utilizing a digital twin system for real-time monitoring and predictive analysis of water and sediment conditions, ensuring effective operational strategies for the reservoir [2] Group 2 - The ongoing high sediment flood in the Yellow River's upper and middle reaches is being closely monitored, with the management center employing advanced technologies such as radar, drones, and automated monitoring platforms to enhance inspection and monitoring efforts [2] - The focus is on increasing the frequency of sediment monitoring at critical points within the reservoir area to ensure the safe and stable operation of the Xiaolangdi Water Control Project [2]
治河度汛两不误——黄河流域调水调沙速览
Xin Hua She· 2025-06-28 07:45
Core Viewpoint - The article discusses the proactive measures taken by the Yellow River Water Resources Department to manage water and sediment during the flood season, emphasizing the importance of coordinated water and sediment regulation to mitigate flooding risks and manage sediment effectively in the Yellow River basin [1][2][4]. Group 1: Flood Management Strategies - The Yellow River basin is expected to officially enter the flood season on July 1, with a focus on coordinated water and sediment management through key reservoirs like Xiaolangdi, Wanjiazai, and Sanmenxia [1][2]. - The strategy includes using large flows to flush sediment from the riverbed and reservoirs, which helps reduce sediment accumulation and prolongs the lifespan of the reservoirs [1][3]. - Since 2002, there have been 29 instances of coordinated water and sediment management in the Yellow River basin, which has helped prevent the riverbed from rising and has initially curbed the shrinking of the main channel [2][4]. Group 2: Technological Integration - The Xiaolangdi reservoir has seen a significant increase in efficiency, with decision-making processing times reduced from 30 minutes to 5 minutes, resulting in an 84% improvement in operational efficiency [3]. - The use of drones for monitoring potential hazards near the Xiaolangdi reservoir enhances safety and ensures smooth water and sediment management operations [2]. Group 3: Weather and Environmental Challenges - The Yellow River basin has experienced a 20% decrease in precipitation compared to the average this year, with forecasts indicating a potential 10% increase in rainfall during the flood season, particularly in the lower reaches [4][5]. - The flood season poses complex challenges, including the risk of sudden droughts and floods, as well as the likelihood of extreme rainfall in localized areas [4][5].