左岸大道
Search documents
军山新城再添交通动脉 中交城投筑就左岸大道助力车谷发展
Huan Qiu Wang· 2025-12-17 05:18
Core Viewpoint - The completion of the Left Bank Avenue in Wuhan significantly enhances regional connectivity and transportation efficiency, serving as a vital infrastructure project for urban development and ecological protection [3][7]. Group 1: Project Overview - The Left Bank Avenue, a key project funded by China Communications Construction Company, spans 5.578 kilometers and connects various major roads, facilitating regional development [3]. - This project is part of Wuhan's major city-level initiatives, aimed at alleviating traffic pressure and enhancing the efficiency of transportation for students and researchers at Huazhong University of Science and Technology [3][4]. Group 2: Construction Innovations - The construction includes urban main roads, two overpass bridges, a pedestrian bridge, and various supporting facilities such as drainage, lighting, and smart traffic systems [4]. - The project team employs innovative construction methods, including segmented construction and prefabrication, to meet tight deadlines while ensuring safety, ecology, quality, and efficiency [4][7]. Group 3: Environmental Considerations - The project integrates ecological protection measures, utilizing high-performance materials like polymer PVC composite templates made from plant fibers to reduce wood consumption [5][6]. - Techniques such as "in-situ solidification" of mud generated during pile foundation work are implemented to convert waste into usable planting soil, thus preventing pollution of the Yangtze River [6]. Group 4: Quality Control and Recognition - The project adopts a meticulous management approach, implementing a "sample first" principle to ensure quality at every construction stage, which has earned it multiple awards for safety and civilized construction [7]. - The overall construction timeline was significantly shortened, with the main line opening for trial operation in August and official completion in November, ahead of schedule by approximately six months [7].
又一条沿江大道全线贯通
Chang Jiang Ri Bao· 2025-08-21 00:28
Core Points - The completion of the 22-kilometer section of the Left Bank Avenue significantly reduces commuting time from 40 minutes to under 20 minutes between Junshan New City and the central urban area [1][4]. Infrastructure Development - The Left Bank Avenue, spanning approximately 60 kilometers with a total investment of 12.1 billion yuan, consists of six construction segments, including the recently completed section from Duncun to Junshan [2]. - The road features a combination of elevated and ground-level auxiliary roads, with a dual four to six-lane configuration, designed to alleviate traffic pressure on major routes and connect seven key industrial parks [2]. Economic Impact - The avenue facilitates the flow of innovative elements in cutting-edge industries such as hydrogen energy, new energy, intelligent connected vehicles, and low-altitude economy, enhancing the development of the "China Auto Valley" [2]. - It supports the transportation needs of universities in the area, laying a solid foundation for innovation and development around the universities, and promotes the upgrade from a "transportation artery" to an "industrial artery" [2]. Future Plans - The construction team emphasizes the importance of not only building roads but also creating beneficial routes for the public and industries, with plans to enhance ramps and supporting facilities to maximize the avenue's effectiveness [3].