Workflow
民勤双茨科200万千瓦风电项目
icon
Search documents
甘肃能源:腾格里沙漠新能源大基地民勤双茨科200万千瓦风电项目获核准
Core Viewpoint - Gansu Electric Power Investment Energy Development Co., Ltd. has received approval for the 2 million kW wind power project in the Tengger Desert, which is part of a larger 6 million kW renewable energy base, aimed at enhancing local energy supply and reducing emissions [1][2]. Group 1 - The project is located in Minqin County, covering several towns, and is expected to utilize local wind resources to generate clean electricity [1]. - Upon completion, the project will reduce carbon dioxide emissions by approximately 3.5485 million tons, sulfur dioxide by about 432.85 tons, and nitrogen oxides by around 651.41 tons annually [1]. - The project is part of a collaboration between Gansu Energy and China Resources Power New Energy Investment Co., Ltd., focusing on the development of the Tengger Desert renewable energy project [1]. Group 2 - The responsible party for the project, Runeng Company, aims to expedite subsequent procedures and construction preparations, emphasizing the creation of high-quality, green, and clean projects [2].
甘肃能源:民勤双茨科200万千瓦风电项目获得核准
Xin Lang Cai Jing· 2026-02-24 08:06
甘肃能源公告,近日,公司收到润能公司转来的民勤县发展和改革局关于转发腾格里沙漠大基地600万 千瓦新能源项目中民勤双茨科200万千瓦风电项目核准批复的通知,核准腾格里沙漠大基地600万千瓦新 能源项目中民勤双茨科200万千瓦风电项目。民勤双茨科200万千瓦风电项目装机容量达到公司2025年末 已发电控股装机容量的10%以上。 ...