Workflow
水系有机液流电池系统
icon
Search documents
宿迁万达实业公司:“四链融合”助力战新项目加速推进
Yang Zi Wan Bao Wang· 2025-10-13 08:09
Core Insights - Jiangsu Yingwei Medical Co., Ltd. has successfully launched a 1.56MW rooftop distributed photovoltaic power generation project, showcasing the deep involvement of Suqian Wanda Power Industry Co., Ltd. in activating new momentum through a "four-chain integration" mechanism [1][3] Group 1: Project Overview - The photovoltaic project utilizes existing rooftop resources of Jiangsu Yingwei Medical, achieving efficient resource reuse without additional land occupation, with a total design capacity of 1560 kW [3] - The project operates under a "self-use and surplus electricity online" model, which meets part of Jiangsu Yingwei Medical's electricity needs, significantly reduces electricity costs, and aids in carbon emission reduction [3] Group 2: Innovation and Development - Suqian Wanda Power Industry has established a "four-chain integration" mechanism, including party building, innovation, service, and talent chains, to support new projects and enhance operational efficiency [4] - The company has successfully completed over 70 project negotiations in the first half of the year, driven by a dedicated innovation team and collaborative efforts with local government and enterprises [4] Group 3: Technological Advancements - The company has achieved significant technological breakthroughs, including a 15% increase in renewable energy consumption efficiency and a reduction in high-altitude work time from 30 minutes to 5 minutes through innovative technologies [6] - In the first half of the year, Suqian Wanda Power Industry made decisions on 25 new investment projects and undertook 27 projects, with a total contract value of 180 million yuan, achieving full coverage of new business in the county [6]
鄂尔多斯万成功电网侧独立储能电站投产运营
Core Viewpoint - The successful commissioning of the Ordos Wansuccess 200,000 kW/800,000 kWh energy storage station marks a significant step in promoting new energy storage technologies and aligns with national carbon neutrality goals [6]. Group 1: Project Overview - The Ordos Wansuccess energy storage project occupies 52,445 square meters with a total investment of 760 million yuan [3]. - The project includes a 195 MW/780 MWh lithium iron phosphate energy storage system and a 5 MW/20 MWh aqueous flow energy storage system, along with a 220 kV booster station [3]. Group 2: Technological Advancements - The project is one of the first 17 independent new energy storage demonstration projects in Inner Mongolia, showcasing the successful application of megawatt-level aqueous organic flow battery systems [4]. - The aqueous organic flow battery system offers advantages such as a long cycle life (≥15,000 cycles) and large capacity for long-duration energy storage [4]. Group 3: Economic and Environmental Impact - The project supports the national strategy for carbon peak and carbon neutrality, contributing to the energy industry upgrade and innovation in Inner Mongolia [6]. - It is expected to reduce coal usage and lower emissions of harmful gases like CO₂ and SO₂, thereby improving environmental quality [6]. - The establishment of the energy storage station is anticipated to stabilize power supply and enhance grid operation safety, benefiting local residents [6]. Group 4: Regional Development - The project aligns with Inner Mongolia's policies to support the large-scale development of new energy storage technologies and serves as a model for future energy storage projects [6]. - The commissioning of the energy storage station is expected to drive local economic growth and accelerate the development of related industries in the Dala County area [6][7].